Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Award of Merit, Water/Environment: Williams Lake Dam Rehabilitation
Industry News

Award of Merit, Water/Environment: Williams Lake Dam Rehabilitation

Machinery AsiaBy Machinery AsiaOctober 12, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Williams Lake Dam Rehabilitation

York, Pa.

Merit Award


Sent by: Gannett Fleming

Owner: The York Water Co.

Main design company: Gannett Fleming

General contractor: Kinsley Construction




The dam was built in 1912 to support fire protection, drinking water and manufacturing needs. Its rehabilitation was made necessary by flood regulations that required an exponential increase in the dam’s designed capacity. The new flood regulations require the dam to handle a probable peak flood of more than 107,000 cubic feet per second, a huge increase in its capacity.

York Water took the opportunity to improve other elements, including the original spillway’s lack of underground drainage, the foundation of the central wall on undisturbed soil rather than bedrock, and an aging bridge and swing gate system. A labyrinth weir constructed on a roller compacted concrete gravity section is founded on bedrock and is designed to handle significantly higher discharge capacities than the original dam. Other upgrades include an outlet valve tower and advanced leak management features. These improvements respected the historic elements of the dam, including the original concrete wall core, which was excavated and confirmed to be intact and structurally sound.

The $40 million project was completed in 22 months, on budget and on schedule.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Project, Interior Improvement/Tenants: Confidential Project
Next Article Award of Merit, Road/Bridge: Emergency repairs and permanent replacement of the I-95 bridge collapse
Machinery Asia
  • Website

Related Posts

Critical Path | Engineering News-Register

January 30, 2026

Augmenta AI helps organize electrical work in schoolwork

January 29, 2026

In the Great Lakes area, a vehicle operated by divers installs new tunnel linings without the need for dewatering

January 29, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Critical Path | Engineering News-Register

Augmenta AI helps organize electrical work in schoolwork

In the Great Lakes area, a vehicle operated by divers installs new tunnel linings without the need for dewatering

Help preserve what makes America’s buildings safe

Popular Posts

Critical Path | Engineering News-Register

January 30, 2026

Augmenta AI helps organize electrical work in schoolwork

January 29, 2026

In the Great Lakes area, a vehicle operated by divers installs new tunnel linings without the need for dewatering

January 29, 2026

Help preserve what makes America’s buildings safe

January 29, 2026
Heavy Machinery

Car hauler trailer kit basics for real world towing

January 26, 2026

Hydraulic tilting gooseneck trailer for transporting heavy equipment

January 26, 2026

Aluminum car trailer with tilt bed explained for real world vehicle transport

January 26, 2026

What is the best cover for a car trailer?

January 23, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.