Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Best Project, Small Project: The Nest at Saddleback
Industry News

Best Project, Small Project: The Nest at Saddleback

Machinery AsiaBy Machinery AsiaNovember 13, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The nest at Saddleback

Sandy River Plantation, Vt.

BEST PROJECT


Sent by: PC construction

Owner: Saddleback Mountain

Main design company: Davies Toews Architecture DPC

General contractor: PC construction

Civil Engineer: Acorn engineering

Structural Engineer: Thorton Tomasetti

MEP Engineer: IEC; Maine wide plumbing and heating

Owner’s representative: Top-of-the-line construction services




Located at an elevation of 3,620 feet near the summit of Saddleback Mountain, the 2,500-square-foot restaurant complements the popular year-round resort offering a unique dining experience, plus a ski-in/ski-out window the winter The 80-seat dining area and 14-seat bar also easily transform into an open-concept event space.

According to the team, the Nest’s design is environmentally conscious and respectful of its picturesque surroundings, with locally sourced forest-based building materials, energy-efficient heating and cooling systems, and the placement of large windows slides that show exceptional views.

The nest at Saddleback

Photo courtesy of PC Construction

A living roof that is covered with hay-scented ferns and native Maine blueberries reduces runoff, insulates the building and mitigates the heat island effect.

Building the nest presented a multifaceted planning and logistical challenge. While work crews could use the ski slopes to get to the site during the summer months, large delivery trucks could not navigate the steep slopes, even in the best of weather conditions.

Most material deliveries were towed up the mountain by bulldozer, requiring deliberate planning and coordination between suppliers, haulers and resort operations. Crews also had to coordinate activity around the early spring breeding season of the rare Bicknell’s thrush, further limiting an already shortened construction season.

The nest at Saddleback

Photo courtesy of PC Construction

The project’s biggest challenge came during excavation with the discovery that the upper several feet of the cornice were unsuitable for structural support. The need to remove the additional ledge and redesign the base extended construction into the winter, eliminating access to the ski slopes.

Working with the station operator, the project team used snowplows after hours to transport material, while project teams shuttled back and forth each day with the station’s chairlift.

The nest at Saddleback

Photo courtesy of PC Construction

The proximity of the construction site to snowmaking equipment, combined with other characteristics of the location, required near-constant maintenance to prevent snow and ice accumulation.

Emphasis on pre-planning and risk reduction strategies resulted in no lost time accidents or recordable incidents during nearly 14,000 man-hours. The nest was completed in time to hold a soft opening through the 2023-2024 ski season.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleHow will a second Trump administration affect transportation policy?
Next Article Sustainability Excellence, Sustainability: Brown University Brook Street Residence Hall
Machinery Asia
  • Website

Related Posts

Jamal Atkins: CIS leader for advancing multimodal infrastructure and mentoring the next generation

May 9, 2026

Gina Semerad: Health engineer Advancing design centered on the human being

May 9, 2026

Dhruv Patel: Leader of power and energy mentors emerging talent

May 9, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Jamal Atkins: CIS leader for advancing multimodal infrastructure and mentoring the next generation

Gina Semerad: Health engineer Advancing design centered on the human being

Dhruv Patel: Leader of power and energy mentors emerging talent

Pramodh Reddy: The design-build leader impacts California’s public sector projects

Popular Posts

Jamal Atkins: CIS leader for advancing multimodal infrastructure and mentoring the next generation

May 9, 2026

Gina Semerad: Health engineer Advancing design centered on the human being

May 9, 2026

Dhruv Patel: Leader of power and energy mentors emerging talent

May 9, 2026

Pramodh Reddy: The design-build leader impacts California’s public sector projects

May 9, 2026
Heavy Machinery

How to secure a car on a trailer safely step by step

April 30, 2026

Folding car trailer buying guide for small garage and easy storage

April 27, 2026

How does car trailer size affect towing capacity

April 17, 2026

Metal car trailer ramps make loading easier and safer

April 13, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.