Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป Award of Merit, Renovation/Restoration: Fairmont Breakers Hotel Long Beach
Industry News

Award of Merit, Renovation/Restoration: Fairmont Breakers Hotel Long Beach

Machinery AsiaBy Machinery AsiaOctober 28, 2025No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Fairmont Breakers Hotel Long Beach


Beach, California


Merit Award


Presented by ARCO National Construction


owner Pacific 6


Leading design company GMA Design Group


General Contractor ARCO National Construction




When this building opened in 1926, it was a luxury waterfront resort, but recently operated as a 233-unit congregate care center. In 2018, a renovation began to transform the landmark into a boutique hotel, with modern energy efficiency systems and historic aesthetics.

The project involved the restoration of key architectural elements such as the exterior facade, the ornate lobby ceiling, a World War II cupola-mounted pillbox and the arcade corridor. The revitalized 14-story property now features 185 guest rooms and suites, a 4,000-square-foot pool, several restaurants and more than 9,000 square feet of retail space.

Custom aluminum windows maintained the building’s original character, and seismic modifications ensured compliance with modern safety standards. But completing the seismic upgrade of the structure required extensive installation of concrete shear wall and FRP reinforcement.

The team also had to demolish and reinforce concrete-filled window openings in updated guest rooms and public spaces to ensure compliance with modern codes and preserve historic integrity.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleUsed Caterpillar-Excavator Market in china Caterpillar used easy trade africa
Next Article Komatsu D275AX Bulldozer Pushing Overburden To Build A Road In Active Coal Mine
Machinery Asia
  • Website

Related Posts

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

August 25, 2026

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Popular Posts

13.5 HP Isn’t Enough: The Truth About XR1300-Powered Mini Excavators

August 25, 2026

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.