Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Joe Benvenuto: Pioneering an uplifting new construction delivery method
Industry News

Joe Benvenuto: Pioneering an uplifting new construction delivery method

Machinery AsiaBy Machinery AsiaJanuary 26, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Joe Benvenuto

Joe Benvenuto spent four years perfecting LIFTbuild’s “top-to-bottom” superstructure construction technology before work began in 2022 on the Exchange, a 207-foot-tall residential building in Detroit. The unorthodox method is based on building completed soil levels on the ground and lifting them into place around the cores, using wire jacks.

“The system is advantageous because it offers a significant reduction in working hours and improvements in safety from building on the ground rather than at height,” says Benvenuto, COO of LIFTbuild, a wholly owned subsidiary of Barton Malow . “Applying the principles of Lean Construction allowed us to utilize the benefits of just-in-time delivery, better design documents and less costly installation of building systems.”

The 16-story project, completed last February, would have been difficult at best to build on its ¾-acre triangular lot, Benvenuto says. It is bordered by city streets and businesses on all sides, and Detroit’s high traffic adjacent to it eliminated the use of a tower crane.

Process efficiencies

Benvenuto was a veteran vice president at Barton Malow with an MBA from Harvard University before taking on the challenge of LIFTbuild. He was keen to incorporate process efficiencies from pre-fabrication and manufacturing methods into his build as well as lift and hired a Lean consultant to track all gains made over conventional delivery.

“I’m always referring to the entire project life cycle,” says Benvenuto of how the building is designed, procured, manufactured and finally erected.

Previous work as a project executive on auto manufacturing jobs in Michigan set the stage for LIFTbuild because they require a similar attention to process, related to production lines. “We try to point out some of the little things that we do from equipment and storage and deliveries that would mimic more of an assembly line, rather than half an acre of layout area,” Benvenuto says.

Joe Benvenuto

Joe Benvenuto
Photo courtesy of LIFTbuild

The exchange is a proof of concept. Benvenuto leads LIFTbuild as general contractor and development partner. He helped the company secure 15 patents for both top-down construction and manufacturing processes.

Benvenuto encourages everyone at LIFTbuild to adopt new process-based terminology, such as calling specific cores “spines” instead of cores, because cores serve as a backbone, similar to a human’s. The walls of the spines are 10 inches to 1 foot thick. Each Exchange steel-framed floor deck contains more than 75 tons of steel and 110 m3 of concrete. Eight wire jacks lifted the 11,000 square meter floor slabs, each weighing 500 tons.

Everyone at LIFTbuild “wanted to learn every aspect of it. They treated it as a prototype job where they weren’t going to go out of their way to prove it cost-effectively,” says Mark Tamaro, general manager of the South Central region of structural engineer Thornton Tomasetti. “They’re going to put in the homework to really make sure we were doing it right,” adds Tamaro, saying Benvenuto understood how each trade was affected by the process.

LIFTbuild is talking to developers interested in leveraging the methodology and is helping customers understand that while it’s a different way to build, the safety protocols and many other processes are the same as with any other project, Benvenuto says.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleDoreen M. Harris: Energizing New Transmission Lines and Expanding US Offshore Wind Turbines New York
Next Article Robert Buckley: Quarterbacking a team that reopened damaged section of I-95 in 12 days
Machinery Asia
  • Website

Related Posts

Merit Award, Specialized Construction: GeoBarrier System at the Furama Riverfront Hotel

December 14, 2025

Best Project, Government Building: New Consulate General of the United States in Merida | The project team overcomes the unexpected

December 14, 2025

Best Project, Sports/Show: Santiago Bernabéu Stadium

December 14, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Merit Award, Specialized Construction: GeoBarrier System at the Furama Riverfront Hotel

Best Project, Government Building: New Consulate General of the United States in Merida | The project team overcomes the unexpected

Best Project, Sports/Show: Santiago Bernabéu Stadium

Merit Award, Power/Industrial: Combined Cycle Implementation at the Santa Cruz Thermoelectric Power Plant

Popular Posts

Merit Award, Specialized Construction: GeoBarrier System at the Furama Riverfront Hotel

December 14, 2025

Best Project, Government Building: New Consulate General of the United States in Merida | The project team overcomes the unexpected

December 14, 2025

Best Project, Sports/Show: Santiago Bernabéu Stadium

December 14, 2025

Merit Award, Power/Industrial: Combined Cycle Implementation at the Santa Cruz Thermoelectric Power Plant

December 13, 2025
Heavy Machinery

Aluminum car trailer

December 2, 2025

Wheel Dozer vs. Crawler Dozer

November 20, 2025

Where can I find reliable mini excavator dealers near me?

October 27, 2025

The complete expert guide to faster and smarter cargo transportation

October 27, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.