Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Brian Witte: Designing innovation solutions for a treacherous stretch of highway in the Canadian desert
Industry News

Brian Witte: Designing innovation solutions for a treacherous stretch of highway in the Canadian desert

Machinery AsiaBy Machinery AsiaJanuary 26, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Brian Witte

Brian Witte was just a freshman in high school when he launched his career in infrastructure. “It was a small town in Iowa, and the professor’s neighbor was the city engineer for a dozen communities,” recalls Witte, Parsons Corp.’s vice president of construction engineering. “They needed help. They hired me at $4.65 an hour, doing street reconstruction drafting. We’d develop drawings, survey, do mockups, inspections—sidewalk and gutter and drainage from start to finish. It was super fun, interesting; I just had stupid luck.”

His later years working with civilian contractors confirmed the conviction that “I’ve learned that I have to be in the field, not just sitting behind a desk,” he says. With the Kicking Horse Canyon project, he was not only in the field, but spearheaded key solutions to smooth out a treacherous and winding stretch of two-lane highway within the assigned schedule and budget.

Kicking Horse Canyon Constructors (KHCC), a design-build joint venture of Aecon, Parsons and Emil Anderson, won the $331 million contract in 2020 to realign and improve the remaining section of Trans-Canada Highway 1 in four lanes of two, eliminating 13 hairpin bends. Crews built four bridges, nine viaducts, and seven mechanically stabilized earth walls, performing large cuts and excavations, relocating utilities, and mitigating rockfalls and avalanches. Even harsh winters haven’t stopped the expressway project, which is slated for completion this winter.

The site traverses a series of unstable slopes, and the rough concept given to the design and construction team had a conventional solution of stabilizing pipe piles installed in front of the retaining walls to support the highway. But after extensive geotechnical exploration, engineers realized that these piles would need to be of large diameters and installed with very little spacing, often with rock anchors holding the top of the pile in place. Their installation would be expensive and time-consuming, and would require complex temporary access and stabilization for equipment.

The rough plan had four or five bridges in the preliminary design, but Witte conceived the idea of ​​throwing bridges and viaducts sideways to reduce stacking and the need to access difficult places. The four bridges are of variable length ranging from 30 to 70 m and are usually located over deep ravines up to 65 m deep. Viaducts have consistent, repeated short spans of approximately 23 m, and are generally less than 5 m above the existing ground.

“I remember seeing the drawing of the Big Horn Bridge,” says Witte. “It was only a three-span bridge, but it was a long way from the road. How are we going to get out? There was no room to build launch beds or buttresses.” The “beauty” of throwing beams sideways, he adds, is that “no more steel is needed now than for permanent structures.”

“I have known Brian for almost 20 years and have worked with him on several challenging projects during that time,” says Mike Gash, KHCC’s Director of Construction. “I have relied on Brian’s experience and knowledge countless times to find perfect solutions to complex problems. Their innovative designs and work on the Kicking Horse Canyon Phase 4 project was no exception to this and was a major factor in the project’s success.”

Witte says teamwork was the key to success. “It’s kind of rare that the concepts you develop pre-offer actually get executed on the plans,” he says. “It felt like a perfect storm. This owner, our team, was the right team. Everything came together to make it work.”

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleTerry Williams: Civil engineer leads North Dakota’s first $3.2 million flood control project
Next Article Doreen M. Harris: New York Energizing America’s First Large-Scale Offshore Wind Turbines and Many New Transmission Lines
Machinery Asia
  • Website

Related Posts

DHS nominee Mullin faces tough questioning, but his nomination is moving forward

March 20, 2026

Prices of construction materials continued to rise in February

March 20, 2026

Construction views to the east | Engineering News-Register

March 19, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Car trailer turn box guide for safe and efficient towing

DHS nominee Mullin faces tough questioning, but his nomination is moving forward

Prices of construction materials continued to rise in February

Construction views to the east | Engineering News-Register

Popular Posts

Car trailer turn box guide for safe and efficient towing

March 20, 2026

DHS nominee Mullin faces tough questioning, but his nomination is moving forward

March 20, 2026

Prices of construction materials continued to rise in February

March 20, 2026

Construction views to the east | Engineering News-Register

March 19, 2026
Heavy Machinery

Car trailer turn box guide for safe and efficient towing

March 20, 2026

How much weight can a flatbed car transporter trailer carry?

March 16, 2026

How to choose the right aluminum deck trailer for heavy vehicles

March 16, 2026

Which material makes the car trailer steel or aluminum more durable

March 12, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.