Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Amkor plans $2 million semiconductor facility in Arizona
Industry News

Amkor plans $2 million semiconductor facility in Arizona

Machinery AsiaBy Machinery AsiaAugust 21, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The plans of Amkor Technology Inc. to build a $2 billion advanced semiconductor packaging manufacturing plant in Peoria, Arizona are moving forward with support from the US Department of Commerce.

The Tempe, Arizona-based technology maker announced plans for the Outsourced Semiconductor Assembly and Test, or OSAT, facility last fall. According to the company, it would be Amkor’s first OSAT in the US and the largest OSAT built in the US to date.

Last month, the U.S. Department of Commerce announced that it had reached preliminary non-binding terms with Amkor to provide the company with $400 million in direct financing plus up to $200 million in CHIPS Act loans and Science 2022, which established $39 billion to support the construction, expansion and modernization of domestic semiconductor manufacturing plants. Amkor also indicated that it plans to claim an investment tax credit that could cover up to 25% of certain costs.

“One of the fundamental goals of the CHIPS and Science Act is to create an advanced packaging ecosystem in the United States to ensure that complete end-to-end chip production occurs domestically,” said Commerce Secretary Gina Raimondo, in a statement. “Advanced packaging drives chip innovation at every level.”

Peoria has also committed to covering $3 million in infrastructure costs to host the facility.

Amkor plans to have more than 500,000 square feet of cleanroom space at the 55-acre Peoria campus. It aims to have the first phase of the manufacturing facility ready in three years. The company did not immediately respond to inquiries about the project’s procurement.

The company has already lined up its first customer for the installation, Apple. Amkor says it worked with Apple on its plans for the plant, as the facility will package and test chips produced for Apple nearby by TSMC at its plants under construction in Phoenix. In semiconductors, “packaging” refers to the casing around the semiconductor, which protects and provides connection to other chips.

“Amkor’s Arizona facility will allow us to support the growing semiconductor manufacturing community … and we look forward to providing our customers with domestic advanced packaging and test capabilities,” said Giel Rutten, President and CEO of Amkor, in a statement.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleIs the Case CX37C Excavator Worth The Hype? | Full Review |
Next Article Efficiency Redefined: TYPHON 18 FLEX 1.8 Ton Mini Excavator USA
Machinery Asia
  • Website

Related Posts

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

February 27, 2026

Tariffs boosted construction input prices until the start of 2026

February 27, 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

February 27, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

What is the safest speed for hauling car trailers

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

Tariffs boosted construction input prices until the start of 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

Popular Posts

What is the safest speed for hauling car trailers

February 28, 2026

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

February 27, 2026

Tariffs boosted construction input prices until the start of 2026

February 27, 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

February 27, 2026
Heavy Machinery

What is the safest speed for hauling car trailers

February 28, 2026

Aluminum car transport trailer for long distance towing and transport of heavy vehicles

February 25, 2026

Why your white utility trailer rusts too quickly and how to choose one that really lasts

February 25, 2026

Best winch for car trailer

February 24, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.