Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Award of Merit, Healthcare: Wisconsin Skywalk Children’s Building
Industry News

Award of Merit, Healthcare: Wisconsin Skywalk Children’s Building

Machinery AsiaBy Machinery AsiaNovember 15, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Wisconsin Skywalk Children’s Building

Milwaukee

Merit Award


Sent by: Boldt

Owner: Childish Wisconsin

Main design company: CannonDesign

General contractor: Boldt

Civil/structural engineer: ACCOUNT

MEP Engineer: Ring & DuChateau


Subcontractors: Arbon Equipment Corp.; ArchKey Solutions; Automated logic; Wisconsin Auto Tickets; Breezy Hill Landscaping



The team built a main entrance and two-story addition to an active hospital, completing the 155,000-square-foot project earlier and under budget. The building houses a level 1 emergency and trauma center, a pediatric and neonatal transport center, a pharmacy and space for future development.

Before work began, the contractor established measures to keep the hospital running while ensuring safety remained at the forefront of every decision. Going into construction, Boldt used a non-destructive hydrovac excavation system for foundation work on the Skywalk building’s entrance deck. Excavating within inches of the facility’s current front door and existing steam, electrical and water services, the work required additional safety precautions.

The project resulted in a tie-in to the existing building, limiting the time and impact on the ongoing operations of the hospital. An integrated project delivery method ensured continuous communication during design, manufacturing and construction, which increased efficiency. A heat recovery chiller reduces energy consumption and provides annual savings in operating costs.

Energy simulations, thermal modeling and third-party commissioning optimized the envelope design, reducing HVAC loads and improving temperature control, airflow regulation and humidity control for improve the comfort of people in the building and reduce energy costs.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAward of Merit, Higher Education/Research: Des Moines University and Medical Center
Next Article Clayco wins EPC contract for $620 million solar wafer plant in Tulsa
Machinery Asia
  • Website

Related Posts

AI boom propels Nvidia to record $215 million in annual revenue

March 4, 2026

Central Park Reservoir to retire equipment over 160 years old

March 4, 2026

How Glavovic Studio harnesses adaptive reuse to design affordable homes

March 4, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

AI boom propels Nvidia to record $215 million in annual revenue

Central Park Reservoir to retire equipment over 160 years old

How Glavovic Studio harnesses adaptive reuse to design affordable homes

Critical Path | Engineering News-Register

Popular Posts

AI boom propels Nvidia to record $215 million in annual revenue

March 4, 2026

Central Park Reservoir to retire equipment over 160 years old

March 4, 2026

How Glavovic Studio harnesses adaptive reuse to design affordable homes

March 4, 2026

Critical Path | Engineering News-Register

March 4, 2026
Heavy Machinery

Average width of a car trailer

March 4, 2026

Buying guide for open aluminum trailers for long-distance vehicle transport

March 3, 2026

How to choose the right car trailer tool box

March 3, 2026

What is the safest speed for hauling car trailers

February 28, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.