Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Award of Merit, Sports/Entertainment: The Bolt – Los Angeles Chargers Home and Practice Facility
Industry News

Award of Merit, Sports/Entertainment: The Bolt – Los Angeles Chargers Home and Practice Facility

Machinery AsiaBy Machinery AsiaOctober 29, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The Bolt – Los Angeles Chargers headquarters and training facility


Second, Calif.


Merit Award


Presented by PCL construction


owner Continental Development Corp.


Leading design company executioner


General Contractor PCL construction


Road engineer KPFF Consulting Engineers


Structural Engineer Walter P Moore


MEP engineer Henderson Engineers


Code consultant Howe Engineers


Low voltage engineer O’Brien Halls




Located in El Segundo, this facility consolidates team operations, player development, media production and community outreach into a single, state-of-the-art headquarters on 14 acres.

A 143,500-square-foot main building houses team offices, a media center, production studios, a sports game studio, training and rehabilitation areas and a full-service kitchen. Direct access roads connect these interiors to soccer fields, a two-lane swimming pool and an elevated outdoor training terrace.

The construction of three full-size natural grass football pitches introduced complex technical and programming challenges. To meet NFL performance standards and avoid delays from the impending historic wet season, the team strategically sequenced grading and drainage work, partnered with a turf specialist and secured custom-grown California desert turf.

A major utility corridor ran beneath the site, requiring precise control of excavation and compaction to protect critical infrastructure. More than 2,000 linear feet of retaining wall was erected to accommodate the elevated design of the facility and maintain a level playing surface on the fields.

At the edge of campus, one corner of the soccer field was directly adjacent to the elevated K-Line subway line. Working at the foot of active light rail required specialized safety training for field crews and ongoing coordination with Metro officials. All three fields and the rest of the facility were completed on time and on budget in June 2024.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleNoya Big and Mini Remote Control Jcb 3dx_4k Testing ‎⁨@Nazib_Ke_Toys⁩ 
Next Article new #excavator #bulldozerofficial #automobile #hitachi #jcb #bulldozer #jcb3dx #xcavator #shorts
Machinery Asia
  • Website

Related Posts

During Safety Week 2026, recognize the dangers of stress

April 10, 2026

EPA adds microplastics to list of pollutants for new regulation

April 10, 2026

The family remembers the spark career of a welder for specialized trades

April 9, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

During Safety Week 2026, recognize the dangers of stress

EPA adds microplastics to list of pollutants for new regulation

The family remembers the spark career of a welder for specialized trades

The $1.17 million rail project in Angola is progressing with construction

Popular Posts

During Safety Week 2026, recognize the dangers of stress

April 10, 2026

EPA adds microplastics to list of pollutants for new regulation

April 10, 2026

The family remembers the spark career of a welder for specialized trades

April 9, 2026

The $1.17 million rail project in Angola is progressing with construction

April 9, 2026
Heavy Machinery

Car drop trailer explained for safer low car transport

April 8, 2026

Car trailer hitch ideas that actually work in real hauling

April 8, 2026

Tilt trailer cylinder explained for real-world load efficiency

April 7, 2026

Triple axle tilting trailer for the transport of vehicles and heavy equipment

April 7, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.