Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Balfour Beatty Nabs 889 million dollars of Texas Road
Industry News

Balfour Beatty Nabs 889 million dollars of Texas Road

Machinery AsiaBy Machinery AsiaApril 28, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Do us know if you have comments.

Prize: Award Interactable Reconstruction Project
Value: $ 889 million
Location: County of Dallas, Texas
Customer: Texas dot

Balfour Beatty, based in London, received a contract of $ 889 million to rebuild part of Intersate 30 at Dallas County, Texas, for the state’s dowry, the contractor announced on April 24.

As part of the contract, Balfour Beatty will rebuild a 2.3 mile section from the route to the east side of the county. It will also increase the number of general purpose lanes from six to 12 to improve congestion and connectivity throughout the city.

In addition, the company will build nine crossings that will link the I-30 to the South Gate, the I-35e Lower Stempmons and the Dallas Horseshoe, all the Balfour Beatty projects previously delivered for Texas Dot.

The project follows another great Texas contract, Balfour Beatty won: the $ 746 million I-35 Reconstruction In a 2.5 miles section of the road on the south side of the center of Austin.

“With decades of experience in executing complex road projects in Dallas and an in -depth comprehension of the region’s infrastructure, we are exclusively positioned to offer these essential improvements,” said Leo Quinn, CEO of Balfour Beatty, in the statement.

The pre -construction will begin in 2026 and it is estimated that the work will last five years until the end, according to the launch.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleHacia 2024 Impact Report: As an organization is building a more inclusive construction industry
Next Article 2.4 million dollars Inglewood People Movalled
Machinery Asia
  • Website

Related Posts

San Jose, California LS Power Ink Agreement for 2 GW of new transmission capacity

April 7, 2026

The White House’s priorities are on full display in the FY 2027 budget request

April 7, 2026

Critical Path | Engineering News-Register

April 7, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Car drop trailer explained for safer low car transport

Car trailer hitch ideas that actually work in real hauling

San Jose, California LS Power Ink Agreement for 2 GW of new transmission capacity

The White House’s priorities are on full display in the FY 2027 budget request

Popular Posts

Car drop trailer explained for safer low car transport

April 8, 2026

Car trailer hitch ideas that actually work in real hauling

April 8, 2026

San Jose, California LS Power Ink Agreement for 2 GW of new transmission capacity

April 7, 2026

The White House’s priorities are on full display in the FY 2027 budget request

April 7, 2026
Heavy Machinery

Car drop trailer explained for safer low car transport

April 8, 2026

Car trailer hitch ideas that actually work in real hauling

April 8, 2026

Tilt trailer cylinder explained for real-world load efficiency

April 7, 2026

Triple axle tilting trailer for the transport of vehicles and heavy equipment

April 7, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.