Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Best Higher Education/Research – Bowdoin College, the John and Lile Gibbons Center for Arctic Studies, and Barry Mills Hall
Industry News

Best Higher Education/Research – Bowdoin College, the John and Lile Gibbons Center for Arctic Studies, and Barry Mills Hall

Machinery AsiaBy Machinery AsiaMarch 8, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Bowdoin College, The John and Lile Gibbons Center for Arctic Studies, and Barry Mills Hall

Brunswick, Maine

Best Higher Education/Research

Presented by: Consigli Construction Co.

Region: ENR New England


Owner: Bowdoin College

Leading design company | Structural Engineer and MEP: HGA Architecture and Engineers

General contractor: Consigli Construction Co.

Civil engineer: Sebago Technics Inc.

Landscape architect: Stimson study


Subcontractors: South County Post & Beam Inc.; ES Boulos Co.; Johnson & Jordan Inc.; Dean & Allyn Inc.; Maine Masonry Company Inc.; Ace Corp.; Windham Millwork Inc.

Matt Tonello, director of operations and project executive for Consigli, says Maine’s first commercial solid wood structure is also the first to use a solid wood siding system to resist wind and seismic loads.

The $28.5 million, 46,000-square-foot project, completed on schedule in 21 months, includes two buildings: the three-story Gibbons Center for Arctic Studies with six offices, several classrooms, an archeology lab and two galleries which house the Peary- MacMillan Arctic Museum Collection; and the two-story solid wood Mills Hall academic building with classrooms and academic, research, and event spaces.

“Construction of these buildings during a global pandemic presented extraordinary supply chain and scheduling challenges” with the massive pre-cut timber shipped in over 30 containers from Europe and “delivered sequentially for assembly on time” , says Matthew Orlando, senior vice president at Bowdoin. for finance and administration.

Bowdoin College

Photo by Michael Moran courtesy of HGA

To protect the sensitive artifacts housed at the Peary MacMillan Arctic Museum, “our team designed an efficient all-electric system maintaining critical temperature and humidity control for the collections,” says Rebecca Celis, director and leader in the arts, community and education sector in Boston. HGA architecture office.

The cross-laminated timber floors and roofs are supported by laminated timber beams and columns and by laminated roofs secured with steel ties, says Lauren Piephho, the company’s structural engineer.

Bowdoin College

Photo by Michael Moran courtesy of HGA

“Bowdoin is committed to eliminating fossil fuel emissions on campus by 2042 through decarbonization strategies and the adoption of renewable energy sources,” Orlando says. The team chose 100 percent electric power for Mills Hall and the Gibbons Center to offset the electrical load with new and existing solar contracts, making those buildings the first net-zero facilities on campus, he adds.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Road/Bridge – Sixth Street Viaduct
Next Article The office sector lags construction planning
Machinery Asia
  • Website

Related Posts

Court to general contractor: too late to claim 600,000 excess underpayment

February 6, 2026

The ice chapel built by a student duo stands tall at the University of Notre Dame

February 6, 2026

Massachusetts Energy Net Positive Bloom School Takes Shape

February 6, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Court to general contractor: too late to claim 600,000 excess underpayment

The ice chapel built by a student duo stands tall at the University of Notre Dame

Massachusetts Energy Net Positive Bloom School Takes Shape

PCL wins contract for $4 million North Dakota gas plant

Popular Posts

Court to general contractor: too late to claim 600,000 excess underpayment

February 6, 2026

The ice chapel built by a student duo stands tall at the University of Notre Dame

February 6, 2026

Massachusetts Energy Net Positive Bloom School Takes Shape

February 6, 2026

PCL wins contract for $4 million North Dakota gas plant

February 6, 2026
Heavy Machinery

Why car trailer weight is so important for safe towing

February 4, 2026

How to choose a smart car trailer

February 3, 2026

Galvanized tilting trailer for the transport of cars and equipment

February 3, 2026

Car hauler trailer kit basics for real world towing

January 26, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.