Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Best Renovation/Restoration: Restoration of Victorian buildings at the Hotel Del Coronado
Industry News

Best Renovation/Restoration: Restoration of Victorian buildings at the Hotel Del Coronado

Machinery AsiaBy Machinery AsiaOctober 28, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Renovation of the Victorian building of the Hotel Del Coronado


Calif.


BEST PROJECT


Presented by Swinnerton


owner BRE Hotels & Resorts


Leading design company GSB Architects


General Contractor Swinerton Builders


Civil Engineer Hale Engineering & Surveying Inc.


Structural Engineer KPFF Consulting Engineers


MEP engineer EXP


Historic Architect Architecture and heritage planning


Landscape architect Burton Studio Inc.




An extensive, multi-phased $128 million renovation has updated rooms, balconies, hallways and support spaces at this historic Coronado hotel. Historic architectural details were carefully preserved while crews made sweeping improvements. The complexity of the project required extensive pre-construction planning. More than 5,000 man-hours were spent on early coordination, constructability reviews and value engineering to identify risks and sequence work efficiently.

The scope of work included improvements to the exterior facade and surrounds, such as repairing existing windows to maintain their historic significance, replacing railings, and painting windows and doors. Crews replaced the MEP, fire protection and low voltage systems and added a new exit staircase to the southeast wing. Historic windows and architectural details were meticulously restored and new finishes were selected to match the original materials.

Despite numerous structural challenges, the project increased the number of rooms to 404 from 367 by creatively reconfiguring the layout of rooms and bathrooms, maximizing usable space and guest comfort without compromising structural integrity.

Hotel Del Coronado

Photo by David Marshall/Heritage Architecture & Planning

Preserving the historic character of the 137-year-old building and maintaining operations as an active hotel throughout construction required detailed phasing and logistics plans, which were updated in real time to address unforeseen structural and infrastructure obstacles. Working closely with hotel management, the contractor minimized disruption to guests by scheduling noisy work during periods of low occupancy and establishing safe alternate routes.

Preserving the historic integrity of the Victorian wing was paramount. The team collaborated with preservation consultants and local authorities, using mock-ups and sample reviews to ensure the new materials matched the original finishes.

Given the historic nature of the hotel, a largely wooden structure built in 1888, the contractor implemented a more robust fire prevention plan. Fire watch coverage was increased from the standard 30 minutes to a 2 hour requirement during and after hot work operations.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleKomatsu D275AX Bulldozer Pushing Overburden To Build A Road In Active Coal Mine
Next Article Lão đại vào xem máy | Kubota #L5018SP 2025 nhập mới 100% về Phú Thọ | #shortvideo
Machinery Asia
  • Website

Related Posts

Q1 2026 Cost Report: Tariffs contributed to price increases for many materials in 2025

March 25, 2026

Q1 2026 Cost Report: Equipment Prices Remain Stable, But Rising Fuel Costs May Affect Fleet Upgrades

March 25, 2026

Q1 2026 Cost Report: Executive compensation increases continued to decline last year after peaking in 2023

March 25, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Q1 2026 Cost Report: Tariffs contributed to price increases for many materials in 2025

Q1 2026 Cost Report: Equipment Prices Remain Stable, But Rising Fuel Costs May Affect Fleet Upgrades

Q1 2026 Cost Report: Executive compensation increases continued to decline last year after peaking in 2023

Texas and the Southeast Scoop | Engineering News-Register

Popular Posts

Q1 2026 Cost Report: Tariffs contributed to price increases for many materials in 2025

March 25, 2026

Q1 2026 Cost Report: Equipment Prices Remain Stable, But Rising Fuel Costs May Affect Fleet Upgrades

March 25, 2026

Q1 2026 Cost Report: Executive compensation increases continued to decline last year after peaking in 2023

March 25, 2026

Texas and the Southeast Scoop | Engineering News-Register

March 25, 2026
Heavy Machinery

Car trailer with hydraulic drop cover makes loading faster and safer

March 23, 2026

Car trailer turn box guide for safe and efficient towing

March 20, 2026

How much weight can a flatbed car transporter trailer carry?

March 16, 2026

How to choose the right aluminum deck trailer for heavy vehicles

March 16, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.