Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Better Water/Environment: Town water treatment plant
Industry News

Better Water/Environment: Town water treatment plant

Machinery AsiaBy Machinery AsiaNovember 21, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Town water treatment station


Medway, Mass.


BEST PROJECT


Presented by Walsh Construction Co. II


Owner: City of Medway


Main design company: Wright-Pierce


General contractor: Walsh Construction Co. II


Structural Engineer: Wright-Pierce


Owner’s attorney: Environmental partners




The $20.6 million project houses advanced water treatment equipment and support facilities and also has room for future treatment of per- and polyfluoroalkyl substances (PFAS), also known as forever chemicals. Although not required at the time of construction, space and infrastructure designated to accommodate PFAS filtration will streamline installation and future testing and significantly reduce the cost, disruption, and time typically associated with retrofitting treatment plants to meet evolving water quality standards.

This proactive strategy benefits the City of Medway and is an example for other municipalities navigating similar emerging pollutant concerns. Beyond future-proofing, the plant also improves system redundancy, ensuring reliable water distribution for Medway residents even in high demand or emergency conditions. The facility’s distribution and treatment processes were developed with input from the city and end users, prioritizing operational efficiency, safety and maintenance.

Town water treatment station

Photo by Tim Abely, courtesy of Walsh Construction Co. II

Modular construction techniques and efficient selection of materials helped accelerate the construction schedule, with all work completed while maintaining uninterrupted service to the city’s water system. Safety challenges were mitigated through careful planning and coordination with union representatives. For example, the limited space at the front of specialized filter canisters required special plumbing expertise to sequence the installation of pipes, valves, and brackets. Comprehensive work planning in collaboration with business leaders ensured that this and other critical tasks were carried out safely and efficiently. By the end of the project, the team had logged nearly 30,000 hours of work with no recordable injuries or incidents.

The project also sought to minimize disturbance to surrounding homes, demonstrating a strong commitment to community impact and communication. When supply chain issues complicated the acquisition of the main electrical gear, the city and the project team collaborated closely to identify alternative solutions and resequence work activities.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Small Project: Thomas Brook Rail Bridge Replacement
Next Article Award of Merit, Excellence in Sustainability: UMass Chan Medical School – Paul J. DiMare Center
Machinery Asia
  • Website

Related Posts

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

February 27, 2026

Tariffs boosted construction input prices until the start of 2026

February 27, 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

February 27, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

Tariffs boosted construction input prices until the start of 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

WSP warns against ‘AI hysteria’ in Q4 earnings call

Popular Posts

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

February 27, 2026

Tariffs boosted construction input prices until the start of 2026

February 27, 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

February 27, 2026

WSP warns against ‘AI hysteria’ in Q4 earnings call

February 27, 2026
Heavy Machinery

Aluminum car transport trailer for long distance towing and transport of heavy vehicles

February 25, 2026

Why your white utility trailer rusts too quickly and how to choose one that really lasts

February 25, 2026

Best winch for car trailer

February 24, 2026

Aluminum tandem axle utility trailer for heavy hauling and long term value

February 24, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.