Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Corps of Engineers
Industry News

Corps of Engineers

Machinery AsiaBy Machinery AsiaFebruary 21, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The United States Army Engineers Corps says that a list published on its website of hundreds of current applications for environmental permits of the project that says it could be accelerated for the Approval of the Executive Order of President Donald Trump, which cites “National Energy Emergency” in the United States

The list of about 700 permit applications, which was published without public ads or previous public comments, are mainly for projects related to fuel energy and include several applications in many cases.

The spokesman for the body, Doug Garman, said in an email response to Enr that the agency “is in the process of reviewing the applications for active permits with respect to” Trump’s order, and added that “the Data field will be added once we have refined what permit actions can be covered by the directive.

The projects that land on the accelerated list include the replacement of the line 5 channel, which transports raw and natural gas from Alberta under Lake Michigan to Ontario and Michigan. The project has waited for the OK body of a federal permission of the clean water law for five years, as they also continue the permit battles with state officials. Accelerated reviews for Louisian Louisian natural gas export terminal, various electric gas plants and a exxonmobil -owned mine project on the northern slope of Alaska could also occur.

The list also has a project of water pipes near Tampa, FLA., Transportation projects, transmission projects that cross the water bodies and a solar energy project, despite the inability of the administration to recognize the progression and viability of renewable energy development in the United States as a key to its mix of energy.

Garman refused to provide added details on how the project selections were made for the approval of accelerated permits; If environmental reviews for these approvals have a more limited scope and/or eliminate criteria under the National Law on Environmental Protection and other laws; The way in which the accelerated designation of the body affects other non -necessary federal and state reviews; and when a revised list will be published.

The body has used emergency designations related to accelerated permits in the past, such as for the reconstruction of disaster recovery, but “emergency permits do not deny the requirements” of environmental analysis and mitigation, or Compliance with legal statutes, says Mark Sudol, a higher regulatory advisor. The Dawson & Associates consultant and an old head of the body regulatory program.

Accelerated projects reviews are shown how the White House Council on environmental quality proposed a temporary final rule that repealed its regulations under the Law of the NEPA and demanded that the federal agencies develop new ones to fulfill the energy order Trump. Last year a court ruling said that the Council had no authority to issue NEPA regulations.

“This rule is the first step in a process where [the council] It will have the opportunity to work with federal agencies to improve the NEPA, “says the Vice President of Builders and Associate Contractors Brubeck.

Sudol says, however, that moving the final rule beyond the provisional stage could take longer to the administration’s estimation throughout the year, as it will involve a public notice and a public commentary, which he will be. Extensive, with the lawsuits.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous Article3 More key bridge contracts were erased
Next Article Dot secretary exploits the high -speed rail of California, seeks financial review
Machinery Asia
  • Website

Related Posts

Massachusetts Energy Net Positive Bloom School Takes Shape

February 6, 2026

PCL wins contract for $4 million North Dakota gas plant

February 6, 2026

Churchill Downs awards contract for new $280 million to $300 million seating structure

February 6, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Massachusetts Energy Net Positive Bloom School Takes Shape

PCL wins contract for $4 million North Dakota gas plant

Churchill Downs awards contract for new $280 million to $300 million seating structure

If you have not embraced the authority to stop work in workplaces, what are you afraid of?

Popular Posts

Massachusetts Energy Net Positive Bloom School Takes Shape

February 6, 2026

PCL wins contract for $4 million North Dakota gas plant

February 6, 2026

Churchill Downs awards contract for new $280 million to $300 million seating structure

February 6, 2026

If you have not embraced the authority to stop work in workplaces, what are you afraid of?

February 6, 2026
Heavy Machinery

Why car trailer weight is so important for safe towing

February 4, 2026

How to choose a smart car trailer

February 3, 2026

Galvanized tilting trailer for the transport of cars and equipment

February 3, 2026

Car hauler trailer kit basics for real world towing

January 26, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.