Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Defense Authorization Act signed into law, blocking progressive design and construction
Industry News

Defense Authorization Act signed into law, blocking progressive design and construction

Machinery AsiaBy Machinery AsiaDecember 22, 2025No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

On December 18, President Donald Trump signed the National Defense Authorization Act for Fiscal Year 2026, enacting nearly $900 billion in defense policy and formally incorporating delivery and procurement reforms that could reshape the way military construction is acquired and executed.

The law authorizes defense policy throughout the US Department of Defense, including acquisition reform and military construction. Although final funding for the project depends on fiscal year 2026 appropriations, the statute now gives defense construction agencies explicit authority to use delivery tools that were previously applied unevenly or cautiously.


RELATED

Final $900M Defense Bill Passes House With Big Changes to Procurement, Infrastructure


For engineering and construction firms, the most consequential provisions are concentrated in Division B—Military Construction Authorizations, particularly Title XXVIII, which governs how projects can be planned, contracted, and delivered.

For the first time, Congress has expressly authorized progressive design and construction for military construction. Section 2809 allows military departments to use “accelerated design and progressive design-build procedures” for MILCON projects, removing long-standing uncertainty over whether ratings-based collaborative delivery models are permissible under federal law.

Progressive build design allows owners to select equipment based on qualifications and collaborate during the initial design before negotiating the final price, rather than fixing the cost at the proposal stage. State and local agencies have used the approach on complex projects, but previously lacked a clear legal basis within the Department of Defense.

The importance is practical: the law now supports the earlier involvement of contractors and designers in projects where the scope, site conditions and sequencing risks are difficult to define in advance, including shipyard work, industrial facilities and overseas post projects.


RELATED

Navy selects eight firms for $15 million Pacific deterrent construction contract


The multi-year procurement body extends beyond maintenance

The NDAA also extends DOD’s ability to contract construction work over several years. Section 2814 authorizes multiyear procurement authority for certain military construction projects, allowing agencies to structure delivery beyond single-year performance periods.

This authority is distinct from MILCON’s traditional annual procurement and is intended to improve cost control, workforce continuity, and schedule certainty in large or phased programs. For contractors, it opens the door to longer planning horizons and potentially less stop-and-start procurement at major facilities.

At the same time, section 2816 authorizes cost plus incentive and fee contracts for selected projects under the Navy Shipyard Infrastructure Optimization Program, recognizing the technical complexity and risk profile of dry dock modernization and shoreline recapitalization work.

Beyond delivery, the law reinforces long-term demand signals. Section 2803 requires military departments to develop and update 20-year infrastructure improvement plans, formalizing a multi-decade planning framework for bases, depots, and industrial facilities.

Other provisions expand the types of eligible projects and flexibility. Section 2807 explicitly includes demolition projects in the Defense Community Infrastructure Program, while section 2804 strengthens requirements related to water management and security at military installations, areas that may generate subsequent civilian and environmental work.

Collectively, the promulgated authorities point toward procurement changes that ENR readers will want to watch closely. Agencies now have legal support to place more emphasis on qualifications-based selection, early pre-construction services and phased pricing, especially on complex or high-risk projects.

Firms with experience in integrated design, cost modeling and construction capability are likely to be better positioned, as owners gain the flexibility to defer final price commitments until design maturity improves. The multi-year authority also favors teams capable of maintaining workforce and supply chain capability over longer lead times.

Implementation will fall primarily to the U.S. Army Corps of Engineers, the Naval Installations Engineering Systems Command and the Air Force Civil Engineer Center, which are expected to issue internal acquisition guidance interpreting the new authorities before applying them to upcoming acquisitions.

Early adoption is expected on technically complex projects such as shipyard recapitalization, depot modernization and Indo-Pacific posture upgrades, but the timing will depend on agency guidance and FY 2026 appropriations.

As with prior defense authorization bills, the law authorizes policy rather than appropriates funding. Still, by enshrining delivery reform directly into statute, the FY 2026 NDAA establishes a lasting framework that could materially change how military construction is planned, contracted, and delivered over the next decade, well beyond a single budget cycle.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticlePort Authority Board Approves 10-Year, $45 Million Capital Plan
Next Article House passes bill that could accelerate AI infrastructure projects
Machinery Asia
  • Website

Related Posts

The judge rejects the offer of a court case in a fight in the living room of the White House

February 26, 2026

American Express uses Turner to build its new global headquarters

February 26, 2026

February 26, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

The judge rejects the offer of a court case in a fight in the living room of the White House

American Express uses Turner to build its new global headquarters

Regional surveys of leading ENR design firms and contractors are now available

Popular Posts

The judge rejects the offer of a court case in a fight in the living room of the White House

February 26, 2026

American Express uses Turner to build its new global headquarters

February 26, 2026

February 26, 2026

Regional surveys of leading ENR design firms and contractors are now available

February 26, 2026
Heavy Machinery

Aluminum car transport trailer for long distance towing and transport of heavy vehicles

February 25, 2026

Why your white utility trailer rusts too quickly and how to choose one that really lasts

February 25, 2026

Best winch for car trailer

February 24, 2026

Aluminum tandem axle utility trailer for heavy hauling and long term value

February 24, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.