Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » FDOT invests $500 million to build 17 miles of express lanes
Industry News

FDOT invests $500 million to build 17 miles of express lanes

Machinery AsiaBy Machinery AsiaOctober 21, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Florida is doing miles of infrastructure work.

Gov. Ron DeSantis announced several projects on Oct. 16, including 17 miles of new express lanes on I-4, which connects the west and east coasts of the state. A new parking lot for truck drivers is also planned in Polk County.

The Florida DOT will build new single express lanes in both directions in Hillsborough County, a part of the state that includes the major metropolitan areas of Tampa and St. Petersburg. The project will cost 500 million dollarsFDOT President and Secretary Jared Perdue said during the announcement.

The new I-4 lanes will run from I-75 to County Line Road. The aim of the project is to reduce congestion by separating long distance traffic from local commuter traffic, providing additional travel options.

Perdue said plans to widen I-4 have been around for 15 years, but it likely would have been another 10 years before the agency could move forward with the project. Instead, FDOT chose to build the project now within the existing roadway right-of-way.

Construction on the project is expected to begin in 2028, according to the governor’s announcement.

The agency did not respond to Construction Dive’s request for comment by press time.

The job announcement comes months after FDOT completed a major interchange upgrade along I-4 in central Florida near Orlando. The agency opened the interchange at Daryl Carter Parkway on July 19, with the goal of better providing motorists with access to residences and commercial locations. It also tried to ease congestion at other nearby I-4 interchanges.

In addition to the new lane expansion, FDOT will also build a 100-space truck parking facility in Polk County, located at the Polk Parkway and I-4 interchange east of Tampa. The I-4 corridor has one of the largest truck parking deficits in Florida, according to the release.

“We actually have an initiative underway right now to bring over 1,400 truck parking spaces to the I-4 corridor as a whole,” Perdue said during the announcement.

In fact, Polk County isn’t alone in getting a planned upgrade for trucker parking. A “pro-trucker package” from the federal DOT will give $180 million to add 917 truck parking spaces along I-4 in Osceola, Seminole and Volusia counties, Trucking Dive reported in July.

The federal award was announced in January 2024 and “implemented” in July 2025, Trucking Dive reported. Estimated construction costs for these lots vary from $29.5 million to 74 million dollars.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleKomatsu D50A Empurrando Material #tractor #bulldozer #farm #farming #automobile #foryou
Next Article Máy Cắt Lúa Kubota DC 93
Machinery Asia
  • Website

Related Posts

A judge orders CTA funding restored so rail projects avoid demobilization

March 27, 2026

Brooklyn’s public libraries are undergoing a massive wooden reconstruction

March 27, 2026

Brooklyn Public Libraries Try Solid Wood

March 27, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

A judge orders CTA funding restored so rail projects avoid demobilization

Brooklyn’s public libraries are undergoing a massive wooden reconstruction

Brooklyn Public Libraries Try Solid Wood

The hidden risks of promoting unprepared leaders in construction

Popular Posts

A judge orders CTA funding restored so rail projects avoid demobilization

March 27, 2026

Brooklyn’s public libraries are undergoing a massive wooden reconstruction

March 27, 2026

Brooklyn Public Libraries Try Solid Wood

March 27, 2026

The hidden risks of promoting unprepared leaders in construction

March 26, 2026
Heavy Machinery

Car Trailer vs Equipment Trailer How to choose the right one

March 26, 2026

Car trailer with hydraulic drop cover makes loading faster and safer

March 23, 2026

Car trailer turn box guide for safe and efficient towing

March 20, 2026

How much weight can a flatbed car transporter trailer carry?

March 16, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.