Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Jacobs reports a 5x jump in data center pipeline
Industry News

Jacobs reports a 5x jump in data center pipeline

Machinery AsiaBy Machinery AsiaNovember 21, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Jacobs enters 2026 with a record-level backlog, largely due to data centers and water projectsaccording to its fiscal fourth quarter earnings call on Thursday.

The wins in the data center industry are still accelerating, CEO Bob Pragada said on the call. Initially, Jacobs’ reach in the industry had been limited to white space, or the main area within these facilities where equipment and network equipment are located.

Now, Pragada said, more of Jacobs’ work also extends to gray space, which includes supporting infrastructure such as power and cooling. The Dallas-based contractor partnership with Nvidia is driving much of that expanded reach, Pragada said.

“We’re seeing interest in data centers now starting in the Middle East and Europe, in addition to the US. The US remains the strongest of the three,” Pragada said on the call. “In the last quarter, our pipeline in the data center space has increased 5x.”

Beyond digital infrastructure, the company highlighted strong growth in other advanced facilities sectors. Semiconductor activity is picking up again, with Jacobs’ US pipeline up about 20% after a slower period, Pragada said.

“In the semiconductor world, we’re seeing more growth after some flatness over the last year,” Pragada said on the call. “It’s really focused on high-bandwidth memory for the US customer in the US”

Head of Jacobs CEO Bob Pragada

Bob Pragada

Courtesy of Jacobs

Life sciences projects also delivered a strong fourth quarter, with the US pipeline up 50%, according to Jacobs. This also reflected strength in water-related activity. Jacobs expects high single-digit growth in the sector heading into 2026.

“The water sector remains a strong sector for us globally, that’s up 50%,” Pragada said. “So overall, the pipeline looks very strong as we head into fiscal 2026.”

Transport activity also continued to strengthen globally. Jacobs won a $166 million contract in August over the $5.5 billion Interborough Express Project in New York City, a 14-mile light rail line connecting Brooklyn and Queens.

“[Sectors] What would drive the higher end of the range would be life sciences and data centers, of course. It’s a matter of these sectors moving to the beat. This shouldn’t be sped up, just keep pace,” Pragada said. “We’re seeing semiconductor manufacturing facilities start to move. And so if that were to accelerate, that would definitely be a tailwind.”

Results Q4

Jacobs reported profit of $122.25 million for its fiscal fourth quarter of the year, about a 62% drop from $325.44 million last year. Revenue for the quarter rose to $3.15 billion, a gain of about 6.4% from $2.96 billion a year ago.

The backlog rose to $23.06 billion, a roughly 5.5% gain from $21.85 billion in the fiscal fourth quarter of 2024, according to the earnings report.

“The record ends in another record,” Baird senior research analyst Andrew Wittmann wrote in a research note. Added strength in the life sciences, data center, water, power, energy and transportation sectors will support strong activity next year. While Wittmann noted weaker free cash flow, he wrote “nothing too surprising” regarding the report.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleNew Colorado Springs volume is expected to increase 42% by 2025 and then climb 37% next year
Next Article Energy-based security metrics: three accounts of how to get started
Machinery Asia
  • Website

Related Posts

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

February 27, 2026

Tariffs boosted construction input prices until the start of 2026

February 27, 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

February 27, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

Tariffs boosted construction input prices until the start of 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

WSP warns against ‘AI hysteria’ in Q4 earnings call

Popular Posts

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

February 27, 2026

Tariffs boosted construction input prices until the start of 2026

February 27, 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

February 27, 2026

WSP warns against ‘AI hysteria’ in Q4 earnings call

February 27, 2026
Heavy Machinery

Aluminum car transport trailer for long distance towing and transport of heavy vehicles

February 25, 2026

Why your white utility trailer rusts too quickly and how to choose one that really lasts

February 25, 2026

Best winch for car trailer

February 24, 2026

Aluminum tandem axle utility trailer for heavy hauling and long term value

February 24, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.