Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป LANE LANDS 337 million I-85 EXAMPLATION
Industry News

LANE LANDS 337 million I-85 EXAMPLATION

Machinery AsiaBy Machinery AsiaJuly 15, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Do us know if you have comments.

Prize: Award Widening of the road
Value: 337 million dollars
Location: Charlotte, North Carolina
Customer: North Dot Carolina

North Carolina Dot selected lane construction To widen the I-85 of six to eight lanes in a section of four miles in the area of Charlotte, according to a statement of July 11 of the agency.

The aim of the project is to improve traffic flow and reduce congestion along the stretch of the intersect between NC 7 in Mount Holly and NC 273 in the west approach of the catawba river in Belmont, according to the launch. Historically, I-85 through Charlotte It has been on the 30 best fatal roads in the country, according to Queen City News.

The scope of Lane Construction’s work, based on Charlotte, includes:

  • Adding a new lane in each direction with a 26 -foot median.
  • Replacement or rehabilitation of six bridges.
  • Modification of the intersection of NC 7/USA 29/USA 74 to improve safety and traffic flow.
  • Reconstruction of 4,000 linear feet of railway for Piedmont and Northern Railway.
  • Additional exchange modifications to increase traffic mobility.

The project will be delivered through the design design method, according to North Carolina dowry. Currently, design work is underway and construction is expected to begin in summer 2026.

It is the first of three agency projects for $ 635 million to add capacity and other improvements along a 10 mile stretch from the I-85 aisle. North Carolina plans to advertise for offers In the segment of exit 23 of McADENVILLE ROAD at the exit of the exchange 17 of the United States 321 by the end of 2028, according to the Charlotte Obser.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous Articleproses excavator naik Selfloder Mitsubishi #excavator #shorts #viral
Next Article JCB track skid steer review
Machinery Asia
  • Website

Related Posts

February 26, 2026

Regional surveys of leading ENR design firms and contractors are now available

February 26, 2026

Immigration crackdowns affect multi-family operators. This is how they respond.

February 26, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Regional surveys of leading ENR design firms and contractors are now available

Immigration crackdowns affect multi-family operators. This is how they respond.

Building begins growth masks underlying weakness

Popular Posts

February 26, 2026

Regional surveys of leading ENR design firms and contractors are now available

February 26, 2026

Immigration crackdowns affect multi-family operators. This is how they respond.

February 26, 2026

Building begins growth masks underlying weakness

February 26, 2026
Heavy Machinery

Aluminum car transport trailer for long distance towing and transport of heavy vehicles

February 25, 2026

Why your white utility trailer rusts too quickly and how to choose one that really lasts

February 25, 2026

Best winch for car trailer

February 24, 2026

Aluminum tandem axle utility trailer for heavy hauling and long term value

February 24, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.