Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Lego selects JV for $1 billion Virginia facility
Industry News

Lego selects JV for $1 billion Virginia facility

Machinery AsiaBy Machinery AsiaFebruary 22, 2024No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Award: Manufacturing facility
value: Not disclosed
Location: Richmond, Virginia
Clients: The Lego Group

The Lego Group has put the pieces together, hiring a joint venture to build its $1 billion manufacturing facility near Richmond, Virginia, the company announced Thursday.

Lexington, Ky.-based Gray Construction and Richmond-based Hourigan have formed a JV to serve as the project’s general contractor and will begin with deep foundation management and site preparation. Lego first started the project in the spring of 2023, and since then the work has included site preparation and ongoing design work.

The companies did not disclose the JV’s share of the contract value in the total $1 billion megaproject.

Lego expects construction of actual factory buildings to begin later this year and full production to begin in 2027, about a year later than originally planned.

The JV will build 13 buildings, totaling 1.7 million square feet on 340 acres. The project will also seek WELL and LEED-Platinum certification and use up to 40,000 solar panels on the ground and 13,000 on the roof, according to the release.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleCASE Continues the Backhoe Revolution with a Rock Solid Warranty on the New CASE 580SV Construction King™ Backhoe
Next Article $11 million SunZia Power Project Suit set for federal court hearing March 7
Machinery Asia
  • Website

Related Posts

Are nuclear power projects ending faster than in the 1970s and 1980s?

January 14, 2026

Joint Venture to Build Upper Harbor Amphitheater in North Minneapolis

January 14, 2026

Are nuclear power projects faster now than in the 1970s and 1980s?

January 14, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Are nuclear power projects ending faster than in the 1970s and 1980s?

Joint Venture to Build Upper Harbor Amphitheater in North Minneapolis

Are nuclear power projects faster now than in the 1970s and 1980s?

Texas and the Southeast Scoop | Engineering News-Register

Popular Posts

Are nuclear power projects ending faster than in the 1970s and 1980s?

January 14, 2026

Joint Venture to Build Upper Harbor Amphitheater in North Minneapolis

January 14, 2026

Are nuclear power projects faster now than in the 1970s and 1980s?

January 14, 2026

Texas and the Southeast Scoop | Engineering News-Register

January 13, 2026
Heavy Machinery

Hydraulic deck utility trailer explained for real world work

January 12, 2026

Aluminum tilting trailer guide for easier loading and long-term towing value

January 12, 2026

How a trailer can transport your vehicle and still feel at home

January 12, 2026

A practical way to bring your agricultural products directly to customers

January 12, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.