Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Merit Award, Residential/Hostel: El Confidencial
Industry News

Merit Award, Residential/Hostel: El Confidencial

Machinery AsiaBy Machinery AsiaDecember 16, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The Confidential


Seattle


Merit Award


Presented by Excel Pacific


owner Security properties


Leading design company Via/Perkins Eastman


General Contractor Excel Pacific


Civil Engineer KPFF Consulting Engineers


Structural Engineer Cary Kopczynski & Co.




This 29-story mixed-use tiered tower in Seattle’s Belltown neighborhood is home to 212 residential units, 9,000 square feet of street-level retail and dining, as well as commercial office space. Among its various massive elements are a four-story brick podium related to nearby historic buildings and a stepped glass tower with cascading terraces.

Faced with a restriction against lifting construction materials on 4th Avenue, which was needed to maintain bike lake access and two traffic lanes, the team designed a custom loading dock that improved subcontractors’ ability to unload materials on site.

The dock allowed materials to be loaded onto the site without using a forklift, ensuring safety and compliance with local regulations. Teams also coordinated with two nearby high-rise tower projects and the Seattle HUB District to navigate construction activities.

Meanwhile, a Stack-A-Shaft steel ladder system provided safer access to the floor than traditional ladders while keeping pace with concrete deck construction. This system expedited the installation of the building’s stairs simultaneously with the building’s structural elements.

This saved time and improved the overall workflow and coordination between construction teams. The project achieved 581,073 man-hours through creative engineering and advanced construction technologies.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleWater/Environment Merit Award: La Pine Water and Wastewater Systems Improvement Project (WWSI)
Next Article Award of Merit, Renovation/Restoration, Excellence in Sustainability: BNBuilders Headquarters
Machinery Asia
  • Website

Related Posts

Court to general contractor: too late to claim 600,000 excess underpayment

February 6, 2026

The ice chapel built by a student duo stands tall at the University of Notre Dame

February 6, 2026

Massachusetts Energy Net Positive Bloom School Takes Shape

February 6, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Court to general contractor: too late to claim 600,000 excess underpayment

The ice chapel built by a student duo stands tall at the University of Notre Dame

Massachusetts Energy Net Positive Bloom School Takes Shape

PCL wins contract for $4 million North Dakota gas plant

Popular Posts

Court to general contractor: too late to claim 600,000 excess underpayment

February 6, 2026

The ice chapel built by a student duo stands tall at the University of Notre Dame

February 6, 2026

Massachusetts Energy Net Positive Bloom School Takes Shape

February 6, 2026

PCL wins contract for $4 million North Dakota gas plant

February 6, 2026
Heavy Machinery

Why car trailer weight is so important for safe towing

February 4, 2026

How to choose a smart car trailer

February 3, 2026

Galvanized tilting trailer for the transport of cars and equipment

February 3, 2026

Car hauler trailer kit basics for real world towing

January 26, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.