Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Merit Award, Road/Highway: Muharraq Ring Road (Busaiteen link)
Industry News

Merit Award, Road/Highway: Muharraq Ring Road (Busaiteen link)

Machinery AsiaBy Machinery AsiaDecember 12, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Muharraq Ring Road (Busaiteen Link)


Busait, Bahrain


Merit Award, Road/Highway


Presented by Ministry of Development, Bahrain and AECOM


Owner: Works Department, Directorate of Road Projects and Maintenance


Leading design company | Project Manager | Civil, structural and MEP engineer: AECOM Middle East


Contractor: Nass and Nassir Hazza Al Subaie to hire


Subcontractors: NASS Electrical Contracting Co.; Nass Asphalt; Joseph Gallagher Middle East; Al Ahlia Contracting Co.; Bahrain Pipes BSC; VSL Middle East; Delmon Ready Mixed Concrete & Products Co.; Associates Ismail Khoonji; Bilfinger Tebodin Middle East; Infra Shore Mechanical Co.




This project adds 8.5 km of dual-lane highway and 2.4 km of related roads to connect one of Bahrain’s busiest traffic corridors. The team used early planning, 24-hour operations and precise sequencing to deliver the project in just seven months, eight months ahead of schedule.

Extensive additional scope was added two months into the project, including the installation of additional sewer lines and the widening of a connecting road. The team coordinated more than 50 subcontractors and 1,500 workers at the peak of the project.

To avoid traffic disruptions, the team chose a trenchless method, using microtunnels to install utilities under active traffic areas. Utilities were integrated in phases, allowing for simultaneous progress and avoiding utility conflicts.

Safety was a priority, especially navigating the extreme heat of the Bahraini summer. The team logged more than 2.5 million hours of work without a lost time incident.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleTutor Perini subsidiary scores $35.8 million USACE contract
Next Article Gilbane, DPS surpass $614 million New York NanoFab project
Machinery Asia
  • Website

Related Posts

Fight disease and delays in the construction of the Panama Canal

December 12, 2025

AECOM wins $270 million federal aviation contract

December 12, 2025

Bedrock Robotics moves the Earth with autonomous excavators

December 12, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Fight disease and delays in the construction of the Panama Canal

AECOM wins $270 million federal aviation contract

Bedrock Robotics moves the Earth with autonomous excavators

Gilbane, DPS surpass $614 million New York NanoFab project

Popular Posts

Fight disease and delays in the construction of the Panama Canal

December 12, 2025

AECOM wins $270 million federal aviation contract

December 12, 2025

Bedrock Robotics moves the Earth with autonomous excavators

December 12, 2025

Gilbane, DPS surpass $614 million New York NanoFab project

December 12, 2025
Heavy Machinery

Aluminum car trailer

December 2, 2025

Wheel Dozer vs. Crawler Dozer

November 20, 2025

Where can I find reliable mini excavator dealers near me?

October 27, 2025

The complete expert guide to faster and smarter cargo transportation

October 27, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.