Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Moving beyond the spreadsheet struggle: How builders can stay on track
Industry News

Moving beyond the spreadsheet struggle: How builders can stay on track

Machinery AsiaBy Machinery AsiaNovember 17, 2025No Comments5 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

You know that spreadsheets run on almost every construction job site. Teams use them to manage schedules, RFIs, safety records, and payment applications. All files are transmitted via email or saved to someone’s computer/laptop, i updated whenever there is time. For years, this worked well enough. But today’s projects are bigger, faster and more complex. What used to keep teams organized now holds them back.

According to Quickbase Gray 2025 Work Report71% of construction professionals say that using multiple project management tools makes it difficult to share information. A superintendent is updating a calendar in the field, a project engineer is back in the office making changes, and finance is working from another version. By the time someone compares notes, the numbers are already out of date.

Our survey also found that, on average, build teams lose over 11 hours each week just tracking updatestime spent searching instead of building. It’s the kind of hidden cost that quietly eats away at schedules, budgets, and even team morale.

Well, the consequences appear every day. A delivery is recorded in one week in one file but never another, leaving teams waiting. Next, an RFI response doesn’t reach a subcontractor until it’s too late and the job has to be redone. Security incidents often sit in paper logs until someone finally writes them down, long after the opportunity to prevent the next problem has passed. Spreadsheets aren’t the problem, but when they become the backbone of construction project management, the result is wasted time and costly mistakes.

Why spreadsheets fall short

There’s a reason why spreadsheets have been a go-to tool for decades. They are flexible and almost everyone knows how to use them. But they were never built to handle the speed and scale of today’s construction projects. When projects rely too much on them, teams end up re-entering data into multiple files, working with outdated numbers, and wasting valuable time reconciling different versions. This delays decision-making and increases the possibility of costly mistakes.

The best path is to keep the best of spreadsheets: flexibility and familiarity, while adding the structure of connected systems, real-time visibility, and reliable data flow.

Making this shift means that construction leaders can go beyond simply recording what happened on a project. They need to see the bigger picture and understand why. Spreadsheets can capture numbers, but rarely reveal the story behind them.

From too many tools to a unified system

Construction has always adapted when new tools proved their worth. We’ve seen teams move from paper drawings to CAD, clipboards to mobile apps, and manual records to digital reports. Each step forward came from adopting more advanced tools, adopting new software, or improving the skills of teams to meet the demands of the job.

But as projects have become more complex, many companies have ended up with a combination of scheduling, RFI, finance, and compliance systems. While each tool solves part of the problem, together they create silos and processes that don’t quite match how teams work. That’s when spreadsheets come back in to fill in the gaps.

The result is more of the problems that all this technology was designed to solve. Updates are stuck in different places. A foreman records a delay in one tool, funding updates costs in another, and by the time someone pulls all that data together, the project has already progressed. Most of us have sat in meetings where the first fifteen minutes are spent just trying to figure out which version of a report is “correct”.

The next shift is to break that cycle by building systems that reflect how contractors actually work. Rather than bending processes to fit rigid software or stitching together disjointed solutions, the goal is to unify workflows so that field teams, office staff, and leadership are connected to the same source of truth. That’s when information moves as fast as the work itself and decision-making becomes proactive instead of reactive.

Visibility that drives better decisions

The companies that thrive will be those that move away from reactive methods and toward workflows built for speed, accuracy and scale. This means moving from static files to living systems, from manual updates to connected processes, and from guesswork to real vision.

This is where purpose-built construction software makes a difference. Building Quickbase Project Hub Pro app gives subcontractors and builders a single dashboard to track budgets, RFIs, schedules and reports, reducing silos and release confusion that slows teams down.

Features like AI spreadsheet import, grid reports, and quick info they’re helping teams maintain the ease of spreadsheets while solving their biggest pain points. They connect scattered files into real-time workflows and surface trend leaders can act with confidence.

And the benefits go beyond efficiency. It’s about building trust in the data that guides every decision, protecting margins, strengthening customer confidence, and giving leaders the visibility they need to steer projects in the right direction. In an industry where every hour counts, the choices we make about how we manage information can make the difference between constant updates and predictable delivery.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleMicron delays construction of $100 million New York megafab
Next Article Projects need builder input on design: Jacobs New York strategic leader
Machinery Asia
  • Website

Related Posts

Construction views to the east | Engineering News-Register

February 28, 2026

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

February 27, 2026

Tariffs boosted construction input prices until the start of 2026

February 27, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Construction views to the east | Engineering News-Register

What is the safest speed for hauling car trailers

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

Tariffs boosted construction input prices until the start of 2026

Popular Posts

Construction views to the east | Engineering News-Register

February 28, 2026

What is the safest speed for hauling car trailers

February 28, 2026

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

February 27, 2026

Tariffs boosted construction input prices until the start of 2026

February 27, 2026
Heavy Machinery

What is the safest speed for hauling car trailers

February 28, 2026

Aluminum car transport trailer for long distance towing and transport of heavy vehicles

February 25, 2026

Why your white utility trailer rusts too quickly and how to choose one that really lasts

February 25, 2026

Best winch for car trailer

February 24, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.