Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Oklahoma is moving forward with a phased design and construction plan for the $250 million bridge replacement
Industry News

Oklahoma is moving forward with a phased design and construction plan for the $250 million bridge replacement

Machinery AsiaBy Machinery AsiaNovember 14, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The Oklahoma Department of Transportation is moving forward with its plan to replace the Roosevelt Memorial Bridge on U.S. Highway 70 by selecting three teams to participate in the next phase of its first modified design-build-build procurement plan.

The Oklahoma Transportation Commission has awarded $2 million in contracts to Manhattan Road & Bridge Co., Walsh Construction Co., and a joint venture between Zachry Construction Corp. and Traylor Bros., Inc. Each team will develop conceptual proposals that include overall design, construction phases, cost estimates and innovation opportunities. A finalist will be selected in 2026 to complete the final design and build the new bridge, which will be located just south of the existing structure and meet updated safety and mobility standards.

In July 2024, the The Federal Highway Administration granted the Oklahoma DOT a $124 million grant from its Bridge investment program for the estimated $250 million project. The grant, the largest transportation award in Oklahoma history, was among 13 major bridge projects to receive federal support across the country.

Unlike traditional design-bid-build delivery, the modified progressive design-build approach involves multiple teams during pre-construction. Once the preferred team is selected, the project progresses to final design and construction.

“This (progressive design and build) method brings designers and builders together throughout the engineering process to promote greater innovation and accelerate project completion by incorporating the builder’s preferred practices into the design,” ODOT Design Director Justin Hernandez said in a statement.

The Roosevelt Memorial Bridge was originally built in 1942 and spans 4,943 feet across Lake Texoma, connecting Bryan and Marshall counties. It carries approximately 8,500 vehicles per day and serves as a vital east-west corridor in southeastern Oklahoma. The existing structure includes a 250-foot Warren truss and is eligible for the National Register of Historic Places. ODOT is currently coordinating with state and federal preservation offices to document its historic significance.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleHKS Named Architect for New DC Soccer Stadium
Next Article Two contractor selections: one ruined, one misunderstood
Machinery Asia
  • Website

Related Posts

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

February 27, 2026

Tariffs boosted construction input prices until the start of 2026

February 27, 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

February 27, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

What is the safest speed for hauling car trailers

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

Tariffs boosted construction input prices until the start of 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

Popular Posts

What is the safest speed for hauling car trailers

February 28, 2026

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

February 27, 2026

Tariffs boosted construction input prices until the start of 2026

February 27, 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

February 27, 2026
Heavy Machinery

What is the safest speed for hauling car trailers

February 28, 2026

Aluminum car transport trailer for long distance towing and transport of heavy vehicles

February 25, 2026

Why your white utility trailer rusts too quickly and how to choose one that really lasts

February 25, 2026

Best winch for car trailer

February 24, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.