Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Project of the Year Finalist, Best Public/Government Building: NYPD Headquarters – 1 Police Plaza – Electrical System Upgrade
Industry News

Project of the Year Finalist, Best Public/Government Building: NYPD Headquarters – 1 Police Plaza – Electrical System Upgrade

Machinery AsiaBy Machinery AsiaNovember 20, 2025No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

NYPD Headquarters – 1 Police Plaza – Electrical System Upgrade


new york


PROJECT OF THE YEAR FINALIST and BEST PROJECT, GOVERNMENT/PUBLIC BUILDING


Presented by H&L Electric


Owner/Developer: The city of New York


Main design company: H&L Electric


General contractor: H&L Electric


Structural Engineer and MEP: Bala Consulting Engineers


Architect: Architect Michelle Drolette




While all good project teams strive for success, the designer and builder of the $38 million electrical infrastructure upgrade serving the New York City Police Department headquarters recognized that failure was not an option. The 16-story, one-million-square-foot facility serves as an operational center that supports life safety and public safety 24/7. The 40-month project, which was completed in May 2024, required the project team to conceptualize, design and execute the entire scope while ensuring continuous and uninterrupted critical and general operations, including the Joint Operation Command Center, the Real-Time Crime Center and the NYPD’s main data center.

“We always said that any disruption to this project would make the front page of the New York Post, and every New Yorker knows that, that’s not a good thing,” recalls Harris Sokoloff, vice president and co-owner of H&L Electric, the designer.

NYPD headquarters

Photo courtesy of H&L Electric

Over the decades since its opening in 1972, the power demands at 1 Police Plaza increased and were met with one-off improvements: trailer-mounted generators, scattered UPS installations, and necessary upgrades. Many systems became obsolete or failed, with no spare parts available. Critically, the building did not have a full generator backup. In response, the NYPD awards a contract to H&L Electric to completely replace the electrical infrastructure. The scope included new generators, UPS systems, automatic transfer switches, switchboards, motor control centers, paralleling devices, transformers and a complete fuel system with new tanks, pumps and structural reinforcements including underwater doors.

With no existing design documents, the design-build update began by conducting field surveys, producing as-built elevation diagrams, and developing a complete in-house construction plan. “Since there were no design drawings, we were able to design and engineer it ourselves,” he says. “That’s normal on a smaller project, but for a project of this magnitude, with so many systems involved, it was unique to have a blank slate to find what the best options were for the NYPD. That’s what we’re most proud of in this job.”

The building information model was used to coordinate tight clearances and avoid pitch conflicts. Models were also used to pre-fabricate off-site components, including new custom watertight generator enclosures. “[The enclosures] Not only did it improve the schedule, but it also reduced site disruption,” says Sokoloff. “Other than placing steel and electrical conduit, we didn’t have to do heavy, pre-formed construction outside.”

NYPD headquarters

Photo courtesy of Bala

To address flooding risks identified during Superstorm Sandy, the generator enclosures were elevated and equipped with “submarine-style” access doors designed to withstand potential significant flood levels.

Early in the project, H&L Electric encountered delays due to extended approval cycles and unexpected work stoppages. Navigating the NYPD’s highly structured and hierarchical chain of command was critical. Complications included strict noise restrictions, security limitations, and organizational silos within the NYPD, which required personalized communication with different departments and commissioners on each floor. Success depended not only on technical accuracy, but on the team’s ability to navigate a highly structured hierarchy, gain trust, and streamline approvals.

NYPD headquarters

Photo courtesy of Bala

During construction, foremen and electricians were empowered to collaborate with project managers and suggest improvements to both design and field installation. Tools, materials and work areas were tightly controlled. On several occasions, construction schedules and worker entry and exit points were quickly adjusted to accommodate real-time events affecting NYPD and City operations. Despite the complexities, the upgrade project was completed on time and on budget. Perhaps most importantly, a complex project that presented daily opportunities for disruption with city-wide consequences was accomplished without critical incident. The team’s meticulous planning, rigorous coordination and execution kept all critical systems operational from start to finish.

The project was completed on budget and on schedule, providing a modern, resilient and fully redundant electrical system for the NYPD, ensuring uninterrupted service to millions of New Yorkers and strengthening the city’s safety infrastructure for decades to come.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleDelta Air Lines Inc.’s airfield reconfiguration team. and LGA has completed the $2.8 million airport project early
Next Article Team Wins $6 Million, 15-Year UK Site Nuclear Waste Cleanup Award
Machinery Asia
  • Website

Related Posts

Best Project, Water/Wastewater: Hydroelectric Power Plant and Julius Nyerere Dam

December 13, 2025

Best Project, Reform/Restoration: Zeinab Khatoun Residence

December 13, 2025

ENR Global Best Projects 2025 Awards

December 13, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Best Project, Water/Wastewater: Hydroelectric Power Plant and Julius Nyerere Dam

Best Project, Reform/Restoration: Zeinab Khatoun Residence

ENR Global Best Projects 2025 Awards

Merit Award, Residential/Hospitality: Riva Residence Tower

Popular Posts

Best Project, Water/Wastewater: Hydroelectric Power Plant and Julius Nyerere Dam

December 13, 2025

Best Project, Reform/Restoration: Zeinab Khatoun Residence

December 13, 2025

ENR Global Best Projects 2025 Awards

December 13, 2025

Merit Award, Residential/Hospitality: Riva Residence Tower

December 13, 2025
Heavy Machinery

Aluminum car trailer

December 2, 2025

Wheel Dozer vs. Crawler Dozer

November 20, 2025

Where can I find reliable mini excavator dealers near me?

October 27, 2025

The complete expert guide to faster and smarter cargo transportation

October 27, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.