Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป San Francisco’s $2.9 million airport project finally gets off the ground
Industry News

San Francisco’s $2.9 million airport project finally gets off the ground

Machinery AsiaBy Machinery AsiaAugust 29, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

After the pandemic forced the project into indefinite suspensionNew York City-based Turner Construction finally broke ground on the $2.9 billion Terminal 3 West modernization project at San Francisco International Airport on August 20, the airport announced in a press release.

The construction team will renovate the existing 650,000-square-foot west half of Terminal 3, according to the release. New features include a seismic retrofit, an expanded security checkpoint and new passenger amenities, along with 200,000 square feet of additional space, which will allow for expanded food and retail concessions.

Turner is leading the design and construction team along with architects Gensler and TEF Design of San Francisco. A joint venture known as WCME JV is the construction manager: the group consists of San Francisco firms PGH Wong Engineering and MCK Americas; Houston-based Consor Engineers; and ECS Consultants based in Chantilly, Virginia.

In addition, the project will feature a new six-story building that will house airline lounges and operational office space, according to the airport. The team will also build a new exterior facade, more space for passenger check-in and new security checkpoints.

SFO is aiming for LEED-Platinum certification in construction. Environmentally conscious building features include displacement ventilation, on-site photovoltaic cells, waste heat recovery, low-carbon steel and concrete, recycled water and green building education, SFO said.

The renovated and expanded western half is expected to open in the fall of 2027, and the six-story building will open in early 2028, according to the news release. A renovated check-in hall at the east end of Terminal 3 is expected to open in early 2029.

“Our goal is to create an extraordinary airport experience for our guests, leading the way in sustainability and innovation, and we hope this project will once again raise the bar for what travelers can expect at SFO,” said Ivar Satero, Airport SFO director, in the premiere.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous Article7-ton excavator in stock for sale #kaixiao #caterpillar #excavator
Next Article Komatsu GD655-7 motor grader operator controls
Machinery Asia
  • Website

Related Posts

The ice chapel built by a student duo stands tall at the University of Notre Dame

February 6, 2026

Massachusetts Energy Net Positive Bloom School Takes Shape

February 6, 2026

PCL wins contract for $4 million North Dakota gas plant

February 6, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

The ice chapel built by a student duo stands tall at the University of Notre Dame

Massachusetts Energy Net Positive Bloom School Takes Shape

PCL wins contract for $4 million North Dakota gas plant

Churchill Downs awards contract for new $280 million to $300 million seating structure

Popular Posts

The ice chapel built by a student duo stands tall at the University of Notre Dame

February 6, 2026

Massachusetts Energy Net Positive Bloom School Takes Shape

February 6, 2026

PCL wins contract for $4 million North Dakota gas plant

February 6, 2026

Churchill Downs awards contract for new $280 million to $300 million seating structure

February 6, 2026
Heavy Machinery

Why car trailer weight is so important for safe towing

February 4, 2026

How to choose a smart car trailer

February 3, 2026

Galvanized tilting trailer for the transport of cars and equipment

February 3, 2026

Car hauler trailer kit basics for real world towing

January 26, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.