Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Skanska gets $450 million in improvements for Logan Airport
Industry News

Skanska gets $450 million in improvements for Logan Airport

Machinery AsiaBy Machinery AsiaDecember 17, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Award: Improvements at the airport
Value: 450 million dollars
Location: Boston
Customer: Massachusetts Port Authority

Skanska has signed a $450 million contract with the Massachusetts Port Authority for construction improvements at Boston’s Terminal E at Logan Airport, the company announced on December 13.

As part of the project, the Sweden-based contractor and developer will build a new 725,000-square-foot, 5,000-space Terminal E parking lot. The structure will be built over an existing parking lot in front of Terminal E, a Skanska spokesperson told Construction Dive. Skanska will have to demolish part of the exit level viaduct to build the new garage.

Construction will begin in the first quarter of 2025 and the garage is expected to be completed in 2028.

In addition, Skanska will build a vehicular bridge to connect to the existing central parking complex, as well as a new pedestrian bridge that will connect the garage to Terminals E and C. The contractor will also modify the arrival and departure routes to accommodate access to the garage. .

As part of the project, Skanska will place photovoltaic panels on the facade and roof of the garage to offset electricity consumption. The project will also seek a Parksmart certification issued by the Green Building Certification Institute.

Modernization of Terminal E at Logan International Airport The project will add four new gate docks, 16 lockers, a modern wine cellar and concession and lounge spaces, according to the project’s website.

Other new amenities include a mother’s room, a pet relief area and a sensory room.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleFortera partners with Sumitomo to bring its low-carbon cement products to Asian markets
Next Article Senator Cruz envisions swift action on DOT, trade candidates
Machinery Asia
  • Website

Related Posts

Merit Award, Specialized Construction: GeoBarrier System at the Furama Riverfront Hotel

December 14, 2025

Best Project, Government Building: New Consulate General of the United States in Merida | The project team overcomes the unexpected

December 14, 2025

Best Project, Sports/Show: Santiago Bernabéu Stadium

December 14, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Merit Award, Specialized Construction: GeoBarrier System at the Furama Riverfront Hotel

Best Project, Government Building: New Consulate General of the United States in Merida | The project team overcomes the unexpected

Best Project, Sports/Show: Santiago Bernabéu Stadium

Merit Award, Power/Industrial: Combined Cycle Implementation at the Santa Cruz Thermoelectric Power Plant

Popular Posts

Merit Award, Specialized Construction: GeoBarrier System at the Furama Riverfront Hotel

December 14, 2025

Best Project, Government Building: New Consulate General of the United States in Merida | The project team overcomes the unexpected

December 14, 2025

Best Project, Sports/Show: Santiago Bernabéu Stadium

December 14, 2025

Merit Award, Power/Industrial: Combined Cycle Implementation at the Santa Cruz Thermoelectric Power Plant

December 13, 2025
Heavy Machinery

Aluminum car trailer

December 2, 2025

Wheel Dozer vs. Crawler Dozer

November 20, 2025

Where can I find reliable mini excavator dealers near me?

October 27, 2025

The complete expert guide to faster and smarter cargo transportation

October 27, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.