Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » The games begin: a look at the new Olympic facilities in Paris
Industry News

The games begin: a look at the new Olympic facilities in Paris

Machinery AsiaBy Machinery AsiaJuly 26, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The world’s attention turns to Paris on Friday for the start of the 2024 Olympics.

But despite hosting 10,000 athletes competing 329 events for medals at the Summer Gamesthe city has seen the construction of only a few new sports facilities, including a swimming field, a climbing wall, and a gymnastics and badminton court.

Aquatic Center

Opened in May, the Aquatics Centre in the Saint-Denis district in the northern suburbs of Paris, it has a modular configuration, with the possibility of changing from a 5,000-seat venue during the games to 2,500 seats for other events in the future. The the site cost $190 millionaccording to NBC Los Angeles.

the center, built by Paris-based Bouygues Constructionwill host artistic swimming, diving and water polo events this summer and will be open to the community after the Games.

Designed by Dutch architecture firm VenhoevenCS and French firm Ateliers 2/3/4 with low-carbon features, the roof of the wooden building is covered with photovoltaic panels, making it one of the largest urban solar farms in France and providing all the ‘energy needed by the installation.

Gate of the Chapel of the Arena

representation of an Olympic arena
Retrieved from Paris 2024 on 26 July 2024

The Gate of the Chapel of the Arena opened in central Paris on February 11. The badminton and rhythmic gymnastics venue was the only new venue to be built in the city center for the Games. The arena cost $150 million, according to NBC Los Angeles.

Designed by the French the architecture firms SCAU and NP2F, the arena has a capacity of 8,000 and will also host badminton and powerlifting at this year’s Paris Paralympics. It was also built by Bouygues Construction.

Sport climbing Le Bourget place

Aerial view of a climbing wall and an urban park.
Retrieved from Paris 2024 on 26 July 2024

The Le Bourget outdoor sport climbing site, which will also be a permanent fixture after the Games, it is located in the Seine-St. Denis. Designed to host competitions in the relatively new Olympic offering of sport climbing, the venue includes an indoor warm-up wall and four outdoor walls.

Sport did its thing Olympic debut in Tokyo 2020 with one men’s singles event and one women’s singles event. For the Paris Games, there will be two events per gender: a standalone speed event and a combined event for bouldering and lead, according to NBC Sports.

The lack of major new construction in Paris is a departure from previous Olympics. By 2021, eight new permanent spaces and 10 temporary installations have been created Tokyo Gameswhich had been delayed by the COVID-19 pandemic.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleHow To Make Wooden JCB ,Easy To Make -DIY #shorts
Next Article New Hitachi Zaxis-7 Wheeled Excavators 🧡
Machinery Asia
  • Website

Related Posts

Middle East construction projects halted as steel construction firms hit by war

March 7, 2026

Uncertainty over trade policy and oil prices drive 11,000 job loss in February

March 6, 2026

The case for building modular and repeatable data centers

March 6, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Middle East construction projects halted as steel construction firms hit by war

Uncertainty over trade policy and oil prices drive 11,000 job loss in February

The case for building modular and repeatable data centers

$668 million settlement advances dredging cleanup of Seattle’s Lower Duwamish Waterway

Popular Posts

Middle East construction projects halted as steel construction firms hit by war

March 7, 2026

Uncertainty over trade policy and oil prices drive 11,000 job loss in February

March 6, 2026

The case for building modular and repeatable data centers

March 6, 2026

$668 million settlement advances dredging cleanup of Seattle’s Lower Duwamish Waterway

March 6, 2026
Heavy Machinery

What most buyers get wrong before transporting their first vehicle

March 5, 2026

Tandem axle aluminum utility trailer

March 5, 2026

Average width of a car trailer

March 4, 2026

Buying guide for open aluminum trailers for long-distance vehicle transport

March 3, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.