Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » The M&E specialist sees half the profits
Industry News

The M&E specialist sees half the profits

Machinery AsiaBy Machinery AsiaJune 1, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Briggs & Forrester’s profit has been halved due to the impact of fixed price contracts and inflation.

The firm, the the UK’s fifth largest M&E specialist and ranked 58th in the CN100 list of the best contractors in 2022saw its pre-tax profit rise from £3.2m to £1.6m in the year to 31 October 2022.

Turnover fell slightly to £229.2m from £234.2m the previous year.

Group chairman and chief executive Paul Burton said in a statement issued alongside the accounts: “It has been a particularly challenging year with [the] The high levels of inflation experienced affected the profitability of some of our fixed price contracts.

“We also experienced some significant project delays where we were not always able to recoup all of our personnel costs.”

The hardest hit part of the business was its engineering services arm, which posted an operating loss of £1.6m.

Referring to this, Burton said: “The financial result was clearly disappointing, significantly affected by the inflation of fixed price contracts that were secured before the war in Ukraine and the resulting high inflation.

“There were also some significant delays to the project, initially caused by the Covid disruption earlier this year and then more recently due to supply issues from other trades where our additional costs could not always be recouped “.

Burton did not specify which projects were delayed, but said there were now “inflation protection measures” in place for most of its contracts and that it was starting to see a reduction in inflation in the market.

Briggs & Forrester reduced its cash in the bank and on hand to £7m in the period, down from £18.9m in the 2021 financial year. The company said it used its bank facility to support the working capital sometimes during the second half of the year until the end of October 2022.

In its earnings statement, the company added that it had since secured a new £4m commercial loan facility under way.

Average headcount fell to 874 in the period, down from 897. The company said it expects to increase headcount again as volumes pick up towards the end of 2023.

“We continue to maintain a highly skilled and experienced workforce and are very proud of our enviable record of staff retention,” Burton added.

In early 2021, the company was part of a series of contractors that became employee-owned trusts. It was the second largest contractor move to the model, incentivized through the tax system, between 2020 and 2022.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleHeavy Vehicle Coloring Book + Sketch Pages: Heavy equipment coloring book with sketch pages to draw, construction coloring book, toddler engineering books with pages to draw inside (Dream Color)
Next Article Extreme Machines: The Fastest, Weirdest, Strongest Machines on Earth! (Y)
Machinery Asia
  • Website

Related Posts

Fluor Tapped for Initial Work on 480 MW Kentucky Data Center Campus

March 20, 2026

Fluor Tapped for Initial Work on 480 MW Kentucky Data Center Campus

March 20, 2026

Procore partners with NVIDIA on Data Center Digital Twins, Kewazo secures $35 million funding round

March 20, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Fluor Tapped for Initial Work on 480 MW Kentucky Data Center Campus

Fluor Tapped for Initial Work on 480 MW Kentucky Data Center Campus

Procore partners with NVIDIA on Data Center Digital Twins, Kewazo secures $35 million funding round

Homeland Security nominee Mullin faces tough questions as nomination moves forward

Popular Posts

Fluor Tapped for Initial Work on 480 MW Kentucky Data Center Campus

March 20, 2026

Fluor Tapped for Initial Work on 480 MW Kentucky Data Center Campus

March 20, 2026

Procore partners with NVIDIA on Data Center Digital Twins, Kewazo secures $35 million funding round

March 20, 2026

Homeland Security nominee Mullin faces tough questions as nomination moves forward

March 20, 2026
Heavy Machinery

Car trailer turn box guide for safe and efficient towing

March 20, 2026

How much weight can a flatbed car transporter trailer carry?

March 16, 2026

How to choose the right aluminum deck trailer for heavy vehicles

March 16, 2026

Which material makes the car trailer steel or aluminum more durable

March 12, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.