Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป US building materials prices rise 3.5% as contractor backlog shrinks
Industry News

US building materials prices rise 3.5% as contractor backlog shrinks

Machinery AsiaBy Machinery AsiaNovember 25, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

U.S. construction input prices rose 3.5 percent in October from a year earlier, according to new U.S. Bureau of Labor Statistics producer price index data analyzed by Associated Builders and Contractors.

ABC said the increase was driven by sustained year-over-year gains in categories such as concrete products, electrical equipment and various steel inputs, adding that continued cost pressure is expected as contractors prepare bids and procurement schedules for 2026.


RELATED

ABC says the big projects hold the commission as small business activity sheets


Materials prices also rose from September, extending a lopsided upward trend that persisted through the federal government shutdown. ABC noted that the high cost environment matched the weakness in indicators in its latest survey data.

Ahead of the federal government’s reopening, the ABC reported on Nov. 11 that its gauge of construction backlog fell to 8.4 months in October, down from 8.5 months in September and the lowest level since May.

The decline was concentrated among the smaller firms in the survey, whose backlog fell sharply to 5.8 months, while the heavy industrial backlog rose to 8.8 months and the infrastructure backlog rose to 9.8 months.

ABC construction portfolio indicator 2012-Oct. 2025

Sentiment softens as inflation remains sticky

ABC’s construction confidence index also weakened in October. Profit margin and headcount expectations declined, while sales expectations remained stable. All three readings remain above 50, indicating that contractors still expect growth over the next six months, but at a slower pace.

“Nearly 65 percent of contractors indicated they believe the U.S. construction industry is contracting,” ABC Chief Economist Anirban Basu said in the Nov. 11 statement.

He added that 23% of contractors expect sales to decline over the next six months, the highest share in more than a year, and that companies that work in data centers continue to experience a notably larger backlog than those that don’t.

The latest price data indicates that construction inflation remains sticky, even as U.S. headline inflation has cooled since the 2022 peak.

High material costs, combined with a weakening backlog and reduced margin expectations, suggest continued pressure on project budgets, particularly in commercial and institutional markets that have shown little upturn this year.

Contractors active in industrial megaprojects and data centers continue to show the strongest portfolios. Firms linked to smaller commercial projects and public sector building works remain the most exposed to prolonged cost escalation, tighter demand and potentially more competitive tenders through early 2026.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleGilbane’s team tops $205 million Ohio prison
Next Article What commercial builders are missing out on Gen Z and the labor shortage
Machinery Asia
  • Website

Related Posts

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

February 27, 2026

WSP warns against ‘AI hysteria’ in Q4 earnings call

February 27, 2026

NJ’s $310 million women’s prison design replaces troubled penitentiary

February 27, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

WSP warns against ‘AI hysteria’ in Q4 earnings call

NJ’s $310 million women’s prison design replaces troubled penitentiary

NLRB reverts to joint employer rule it crafted during Trump’s first term

Popular Posts

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

February 27, 2026

WSP warns against ‘AI hysteria’ in Q4 earnings call

February 27, 2026

NJ’s $310 million women’s prison design replaces troubled penitentiary

February 27, 2026

NLRB reverts to joint employer rule it crafted during Trump’s first term

February 27, 2026
Heavy Machinery

Aluminum car transport trailer for long distance towing and transport of heavy vehicles

February 25, 2026

Why your white utility trailer rusts too quickly and how to choose one that really lasts

February 25, 2026

Best winch for car trailer

February 24, 2026

Aluminum tandem axle utility trailer for heavy hauling and long term value

February 24, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.