Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Veolia is installed with Michigan on the Flint Water Crisis for $ 53 Million
Industry News

Veolia is installed with Michigan on the Flint Water Crisis for $ 53 Million

Machinery AsiaBy Machinery AsiaFebruary 24, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The consulting engineering firm Veolia North America has agreed to a civil settlement of $ 53 million related to lead pollution in the water supply of the city of Flint, Mich. announce on February 21.

Veolia na, based Detroit Lake water supplied water to the Flint River in 2014. Water distribution pipes began to corrode after switch and lead and other pollutants were leaked to drinking water Municipal. The demand that was resolved was filed on behalf of 26,000 people affected by the water -contaminated water. Michigan’s Attorney General Dana Nessel said in a statement that the state will dismiss its separate demand against the company. The Declaration of the Attorney General said that the $ 53 million would be distributed among the plaintiffs, including families where both adults and children were exposed to lead -contaminated water.

“Although no amount of money can completely repair damage to the Flint community, these funds will provide additional resources to those affected directly, especially the children of Flint, due to this avoidable crisis,” said Attorney General Nessel in the statement.

Veolia na, in his statement, said that the settlement was not an admission of guilt and argued that public officials had to blame what happened and referred to a jury trial, of which he was. In the federal court in 2022, with Veolia and another engineering consultant, Lockwood Andrews Newnam, against law firms representing the children of Flint and their Families.

“Veolia North America is behind his good work in Flint. The only jury who had to consider the facts and listening to the truth did not find a test that said the opposite, “the statement said, referring to the almost six -month judgment that ended in an error.

“For the past eight years, we have been defending our work and reputation against unsuccessful attacks,” the statement continued. “As clearly shows the events of the 2022 trial, the Flint Water Crisis was caused by government officials. It is a rag that almost a decade since the crisis was launched, although no person Really responsible has been responsible. Parts involved.

After the mistreatment, Veolia na resolved the legal case involved in the 2022 trial with families for $ 25 million last October. Both Nessel and Veolia Na’s statements refer to this state agreement as the end of the litigation derived from Flint’s water crisis.

“”After years of legal battles elaborated, this agreement finally closes a chapter for Flint residents, “said Nessel in his statement.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleJim Johnson selected as the winner of Colorado’s legacy by 2025
Next Article Doug Watts appointed the Interouuntain Legacy Award of 2025
Machinery Asia
  • Website

Related Posts

Court to general contractor: too late to claim 600,000 excess underpayment

February 6, 2026

The ice chapel built by a student duo stands tall at the University of Notre Dame

February 6, 2026

Massachusetts Energy Net Positive Bloom School Takes Shape

February 6, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Court to general contractor: too late to claim 600,000 excess underpayment

The ice chapel built by a student duo stands tall at the University of Notre Dame

Massachusetts Energy Net Positive Bloom School Takes Shape

PCL wins contract for $4 million North Dakota gas plant

Popular Posts

Court to general contractor: too late to claim 600,000 excess underpayment

February 6, 2026

The ice chapel built by a student duo stands tall at the University of Notre Dame

February 6, 2026

Massachusetts Energy Net Positive Bloom School Takes Shape

February 6, 2026

PCL wins contract for $4 million North Dakota gas plant

February 6, 2026
Heavy Machinery

Why car trailer weight is so important for safe towing

February 4, 2026

How to choose a smart car trailer

February 3, 2026

Galvanized tilting trailer for the transport of cars and equipment

February 3, 2026

Car hauler trailer kit basics for real world towing

January 26, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.