Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » While Trump Tou “Alligator Alcatraz,” Desantis makes plans for the second installation
Industry News

While Trump Tou “Alligator Alcatraz,” Desantis makes plans for the second installation

Machinery AsiaBy Machinery AsiaJuly 8, 2025No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The administration of Trump and the Governor of Florida have explained a rapidly built detention installation for workers without arrested federal lands in the Everglades de Florida, but opponents on June 27 filed an emergency motion to stop the continuous use and development of the place that will cause irreparable damage to the environment sensitive areas.

The installation, called by the Administration as “Caimà Alcatraz”, is located about 37 miles west of Miami at the site of the old Dade-Collier Training and Transition Airport, which was used for government formation until it closed in the late 1960’s, leaving a track in its place.

The Governor of Florida, Ron Desantis (R), for example, has defended the new installation, saying to the media in an informative session of July 1 that it was built in eight days, has the capacity for more than 3,000 detainees and has more than 200 security cameras, 28,000 feet more of wire and 400 security staff. The detainees will be housed in the trailers of the Federal Emergency Management Agency and the “Temporary Facilities of the Soft Face”, told CNN a US Department of National Safety Officer in CNN.

Desantis said that the construction of the installation and operation of one year would cost the State a dear of $ 450 million, but said that the state would request FEMA’s refund.

The ICE had more than 56,000 people in arrest in mid -June, Bloomberg said in a federal data analysis, but the agency is only funded to have about 41,500.

Qualified emergency qualified

Kevin Guthrie, head of the Florida Emergency Management Division, said that the contractors hired so far were already precalmed to work in emergency services. State Disantees and officials did not go through state tender requirements and environmental review quoting a 2023 Emergency Order that stated in response to Cuban and Haitian migrants arriving by boat in the keys of Florida. Since then, the governor has expanded this immigration emergency order several times.

Among the contractors of the identified site is SLSCO LTD., a Galveston construction firm, based in Texas, which built parts of the border wall of the first Trump administration in three states and has recently been offering new barrier contracts. According to Florida Government website, collected by Miami Herald, SLSCO has received a Florida contract with a value of up to $ 17.7 million for other emergency work. The company did not respond to ENR through the time of stories publications on July 8.

Other contractors named as winning contracts include Garner Environmental Services, a disaster company; Deployed resources, a logistics company; CDR Maguire, provider of health services; Gardaworld Safety Contractor and a portable toilet provider. Also, the generators and lifts rented by contractors of the Sunbelt Rental rental company were visible at the press conference on July 1. Guthrie said that as it was built, the installation can support a hurricane in category 2 and could be quickly evacuated in the event of a storm. Desantis told journalists that the installation would not expand beyond the original airport footprint, but rather the state plans a second detention installation in Camp Blanding, a Florida National Guard base near Jacksonville. GARDAWORLD was previously hired to build a Chicago -like shelter before the State blocks it.

Mount challenges

Meanwhile, in his demand that is now being made to the Federal District of Miami, Friends Challenger of Everglades, represented by Earthjustice and the Center of Biological Diversity, demand national security, American immigration and compliance with the Dua (ICE), the Florida Emergency Management Agency and the County of Miami-Dade.

Groups say that state officials gathered the place without environmental reviews or opportunities for public contributions. “This scheme is not only cruel, but also threatens the Everglades ecosystem that state and federal taxpayers have spent billions to protect,” said Eve Samples, executive director of Friends of Everglades, in a statement, including the extensive work of the North -American Army Engineers Corps. The opponents have also played their protection capacity against hurricanes.

The United States Department of Justice said in a response on June 30 that the demand was not “mature” for its review and that it is “an indefinite waterproof and does not specify the acts that the county should fulfill to fulfill”. In the county response to the temporary containment request, Miami-Dade County Prosecutor, Geraldine Bonzon-Keenan, said that Governor Desantis is “expressly authorized to” use state and local resources “as reasonably necessary to deal with the emergency.”

The Miccosukee Indians tribe is opposed to the proposed installation, citing impacts on the sensitive areas and communities, said the President of the Talbert Cypress tribe in a prepared statement. “We have contacted the administrations of Desantis and Trump to determine a way to go,” he said.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous Article#libherr #discharging #surveying #shipping #safetyfirst #digitalscale #ship #surveyors
Next Article rollySnow Master John Deere (item no. 408993) | rolly toys | attached on John Deere 8400R | 8R
Machinery Asia
  • Website

Related Posts

Ironworkers’ IMPACT conference sees massive growth in wood and nuclear power

March 5, 2026

The new pipeline W.Va. of 250 million dollars will begin construction

March 5, 2026

APTA is calling for a $268 million investment in public transit and passenger rail over 5 years

March 5, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Ironworkers’ IMPACT conference sees massive growth in wood and nuclear power

The new pipeline W.Va. of 250 million dollars will begin construction

APTA is calling for a $268 million investment in public transit and passenger rail over 5 years

Littlejohn-GDS deal takes aim at planning bottlenecks that will slow US grid projects

Popular Posts

Ironworkers’ IMPACT conference sees massive growth in wood and nuclear power

March 5, 2026

The new pipeline W.Va. of 250 million dollars will begin construction

March 5, 2026

APTA is calling for a $268 million investment in public transit and passenger rail over 5 years

March 5, 2026

Littlejohn-GDS deal takes aim at planning bottlenecks that will slow US grid projects

March 5, 2026
Heavy Machinery

What most buyers get wrong before transporting their first vehicle

March 5, 2026

Tandem axle aluminum utility trailer

March 5, 2026

Average width of a car trailer

March 4, 2026

Buying guide for open aluminum trailers for long-distance vehicle transport

March 3, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.