Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป LG pauses construction on part of $5.5 million Arizona battery plant
Industry News

LG pauses construction on part of $5.5 million Arizona battery plant

Machinery AsiaBy Machinery AsiaJuly 1, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Dive brief:

  • LG Energy Solution has temporarily shut down a portion of its $5.5 billion battery manufacturing complex in Queen Creek, Arizona, according to a company statement shared with Construction Dive.
  • The $5.5 billion complex consists of two manufacturing facilities: a stand-alone cylinder plant and an energy storage systems battery plant. LG confirmed that only the ESS battery facility will be put on hold, while construction of its electric vehicle cylindrical battery facility will continue as planned.
  • “LG Energy Solution is adjusting the execution pace of planned investment efficiently and flexibly according to market conditions,” the company’s global communications team said in the statement. “We still believe the facility will play an important role in our North American operations as we expect continued growth in the US ESS market.”

Diving knowledge:

The city of Queen Creek noted in a statement to Construction Dive that the project had previously been put in place hiatus in 2022 due to the rising costs of inflation. Yates Construction, the development’s general contractor, based in Philadelphia, Mississippi, resumed construction in 2023.

“Construction delays and changes in the project schedule are not uncommon, especially for projects of this scale,” Queen Creek said in the statement. “The city and county remain committed to the Advanced Manufacturing Corridor and continued collaboration with LGES.”

The ESS battery installation, the stalled part of the project, will be one of the first ESS exclusives battery production facilities in the world, according to LG. The facility will produce lithium iron phosphate pouch batteries for energy storage systems.

These batteries allow homeowners to store the energy generated by their solar panels and use it when the sun goes down. This stored energy can also be used during a power outage, when the solar panels are shut down for safety reasons.

The cylindrical battery plant, on the other hand, will produce series 46 batteries for electric vehicles. LG hopes that this part of the $5.5 billion project will be completed by the end of 2025, according to the company.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThe O&G/Tutor Perini team was awarded the Amtrak Connecticut River Bridge Replacement
Next Article Backhoes Market Company Share, Major Competitors,
Machinery Asia
  • Website

Related Posts

Critical Path | Engineering News-Register

September 26, 2026

Supervisors and Field Managers Are Overburdened: Can Agent AI Monitoring Help?

September 26, 2026

Why professional indemnity insurance is ticking the clock for AE firms

September 26, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

This is the most important part of a backhoe

VIDEO: A shirtless man takes a backhoe on a promenade, destroys signs and lampposts

Critical Path | Engineering News-Register

Supervisors and Field Managers Are Overburdened: Can Agent AI Monitoring Help?

Popular Posts

This is the most important part of a backhoe

September 27, 2026

VIDEO: A shirtless man takes a backhoe on a promenade, destroys signs and lampposts

September 26, 2026

Critical Path | Engineering News-Register

September 26, 2026

Supervisors and Field Managers Are Overburdened: Can Agent AI Monitoring Help?

September 26, 2026
Heavy Machinery

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

3-Car Wedge Trailer: How can it improve vehicle transportation efficiency?

September 21, 2026

Single Axle Tilt Trailer: What you need to know before you buy?

September 20, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.