Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป The $4.7 million Gordie Howe Bridge tops it
Industry News

The $4.7 million Gordie Howe Bridge tops it

Machinery AsiaBy Machinery AsiaJuly 16, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Dive Brief:

  • The C$6.4 billion ($4.68 billion) Gordie Howe International Bridge between Windsor, Ontario and Detroit, is now connected, the builders announced on July 9. The installation of the final part of the bridge deck is a key milestone for the Windsor-Detroit border crossing, the busiest land border crossing in North America.
  • Ironworkers and operating engineers celebrated with a handshake between union locals from the two nations as part of a completion ceremony, according to a news release from Toronto-based contractor Aecon.
  • The rest of the work on the bridge includes stress cables; installation of electrical, fire extinguishing and drainage systems; add barriers, signage, lighting, roof paving and pavement markings; and complete a multi-use trail, according to the project’s website.

Diving knowledge:

Bridging North America, a consortium of Irving, Texas-based Fluor, ACS Infrastructure and Madrid-based Aecon, is building the span through a public-private partnership with the Windsor-Detroit Bridge Authority.

Construction of the bridge deck began in December 2022 on opposite banks of the Detroit River, which progressed toward each other over the following months. By the end of May, the last concrete slabs had been installed for the Canadian and American sides, and the remaining distance to connect the bridge deck had been reduced to about 36 feet.

The toolmakers and operating engineers then embarked on a painstaking process lasting several weeks to install the final segment, which involved taking the Canadian side of the bridge deck about 6 inches and using temporary bracing pieces to keep the structure in line before fitting the steel edge beams and other components of closure, according to the project’s website. The midpoint closure is custom designed to fit the gap, unlike the other 54 pre-engineered segments that make up the bridge deck.

“Building the deck of the bridge segment by segment is a marathon of construction cycles and is very intensive,” said Jaime Castro-Maier, lead engineer of Aecon’s construction team. “At the end point, we were just millimeters away from where we expected to be. When you look at the magnitude of this construction site and the size of the bridge deck, talking millimeters was very rewarding.”

Construction is occurring concurrently on the other three elements of the project, the Canadian and US ports of entry and the Michigan Interchange, including:

  • Interior work in all Canadian port of entry buildings including window fittings, heating and cooling, electrical, plumbing and flooring.
  • Interior work on more than half of US port of entry buildings.
  • Placing beams on the I-75 ramps leading to the US port of entry.

The the bridge is still on its way to close in fall 2025, according to a May post on the project’s website. The project began in 2019 and was originally scheduled to be completed in 2024, but officials said the project was delayed due to issues related to COVID-19.

Once complete, the Gordie Howe Bridge will be the longest cable-stayed bridge in North America.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleV12 Detroit Terex sitting for 15-20 years yes it will start and drive 12 miles
Next Article The Concept Wheel Loader LX03 : The Project
Machinery Asia
  • Website

Related Posts

Critical Path | Engineering News-Register

September 26, 2026

Supervisors and Field Managers Are Overburdened: Can Agent AI Monitoring Help?

September 26, 2026

Why professional indemnity insurance is ticking the clock for AE firms

September 26, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

This is the most important part of a backhoe

VIDEO: A shirtless man takes a backhoe on a promenade, destroys signs and lampposts

Critical Path | Engineering News-Register

Supervisors and Field Managers Are Overburdened: Can Agent AI Monitoring Help?

Popular Posts

This is the most important part of a backhoe

September 27, 2026

VIDEO: A shirtless man takes a backhoe on a promenade, destroys signs and lampposts

September 26, 2026

Critical Path | Engineering News-Register

September 26, 2026

Supervisors and Field Managers Are Overburdened: Can Agent AI Monitoring Help?

September 26, 2026
Heavy Machinery

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

3-Car Wedge Trailer: How can it improve vehicle transportation efficiency?

September 21, 2026

Single Axle Tilt Trailer: What you need to know before you buy?

September 20, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.