Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป The park service’s Tidal Basin upgrade will be its most expensive rehabilitation job
Industry News

The park service’s Tidal Basin upgrade will be its most expensive rehabilitation job

Machinery AsiaBy Machinery AsiaAugust 23, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Dive brief:

  • Construction has begun on a $113 million effort replace the sinking seawalls around the tidal basin and along the Potomac River in Washington, D.C., to protect the area from high tides, sea level rise and storm surge, according to an Aug. 15 news release from the National Park Service .
  • The project aims to provide a century of protection to the surrounding national monuments and landscapes, including the capital’s famous Japanese cherry blossom trees, the statement said. NPS used Cianbro Construction of Pittsfield, Maine, to do the work.
  • The existing century-old levee has sunk more than 5 feet in some areas. That settlement, combined with more than a foot of sea-level rise, causes water to flow over parts of the levees twice a day during normal high tides, according to the release.

Diving knowledge:

Every year, millions of visitors from around the world are drawn to the Tidal Basin, a 107-acre man-made reservoir between the Potomac River and the Washington Canal, to see the national monuments and cherry blossoms. However, despite several repairs over the decades, its levees are no longer structurally sound and pose a threat to the safety of visitors and the landscape, including the historic cherry trees.

According to the statement, a crowd gathered last week to watch the ceremonial driving of the first 80 feet piled into the rock. Contractors will add 700 piles to create a solid foundation for the new expanded stone and concrete wall. They will save and reuse the stones of the historic wall in the rehabilitated seawalls wherever possible.

“This vital levee project will eliminate hazards, improve accessibility and ensure the long-term protection of this world-renowned environment,” National Park Service Director Chuck Sams said in the statement. it is NPS’s most expensive rehabilitation project never, according to WTOP.

The project involves:

  • Rehabilitation of approximately 6,800 feet of seawall to extend its service life by 100 years.
  • Levee reconstruction with a pile-supported platform foundation to prevent settlement and allow for future height extensions if necessary due to sea level rise or increased storm surge elevations.
  • Increased seawall height to 4.75 feet within the tidal basin and 5.50 feet along West Potomac Park to account for wind and waves.
  • Repair, replacement and extension of footbridges to improve accessibility around the Conca de la Marea.
  • Regrading of landscaping adjacent to levees to provide adequate drainage.

Construction on the Tidal Basin levee is expected to be completed by late spring 2026, and work on the Potomac River is expected to be completed by winter 2026, according to the release. Federal money from the Great American Outdoors Act Legacy Restoration Fund is fully finance the project.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleHitachi 26U Mini Excavator Review
Next Article Zoomlion Rice Harvester 4.0ZD
Machinery Asia
  • Website

Related Posts

The United States already has a negative immigration rate. This is bad for construction.

April 17, 2026

The EPA highlights the plan to promote greater reuse of water by public services, the energy sector

April 17, 2026

Court awards $174.6 million in damages against Tutor Perini in Philadelphia hotel dispute

April 17, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

The United States already has a negative immigration rate. This is bad for construction.

The EPA highlights the plan to promote greater reuse of water by public services, the energy sector

Court awards $174.6 million in damages against Tutor Perini in Philadelphia hotel dispute

DOT restores Second Avenue subway funding under court watch

Popular Posts

The United States already has a negative immigration rate. This is bad for construction.

April 17, 2026

The EPA highlights the plan to promote greater reuse of water by public services, the energy sector

April 17, 2026

Court awards $174.6 million in damages against Tutor Perini in Philadelphia hotel dispute

April 17, 2026

DOT restores Second Avenue subway funding under court watch

April 17, 2026
Heavy Machinery

How does car trailer size affect towing capacity

April 17, 2026

Metal car trailer ramps make loading easier and safer

April 13, 2026

Car drop trailer explained for safer low car transport

April 8, 2026

Car trailer hitch ideas that actually work in real hauling

April 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.