Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Key bridge reconstruction contract issued
Industry News

Key bridge reconstruction contract issued

Machinery AsiaBy Machinery AsiaAugust 30, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Award: Design and construction of phase 1 replacement of the key bridge
Value: 73 million dollars
Location: Baltimore
Customer: Maryland Transportation Authority

On Thursday, the Maryland Transportation Authority Board approved a $73 million design-build contract to Kiewit Infrastructure Co. for Phase 1 of the complete design and construction of the Francis Scott Key Bridge Replacementaccording to a press release from the MDTA. Kiewit Construction Company is headquartered in Omaha, Nebraska.

The I-695 Key bridge collapse drew global attention in March when the freighter Dali struck one of its supports, causing the historic span to sink into the Patapsco River. The four-lane, 1.6-mile bridge was a major crossing for Baltimore traffic.

While the cost estimate for reconstruction is not final, the MDTA currently pegs it at $1.7 billion, funded by a combination of insurance proceeds, cash on hand, bond financing, litigation recoveries and federal funds, according to the project’s website.

Kiewit will develop project scope and requirements in collaboration with MDTA and other project stakeholders, according to the release. The MDTA is using a progressive design and construction process for the rebuild, which is divided into two phases. This method “emphasizes cooperation and flexibility to adapt to emerging needs and changes,” according to the statement.

Upon successful completion of Phase 1, Kiewit will have exclusive negotiating rights for Phase 2, which includes final design and engineering as well as construction. In the event that a guaranteed maximum price is not agreed upon, the MDTA will deliver the work through an independent procurement mechanism, according to the release.

Reconstruction is scheduled to begin in 2025, and the replacement bridge is expected to open in the fall of 2028, according to the release. MDTA said it will work to foster collaboration between the project team and local communities, and to ensure opportunities for small and disadvantaged businesses.

“The scope of the project and the accelerated schedule will require a substantial amount of skilled labor to complete construction quickly, safely and reliably,” according to the statement.

In July, the Federal Highway Administration issued a categorical exclusion classification and approval of the National Environmental Policy Act for the projectsince the replacement will take place within the site of the old bridge and will have the same capacity.

There’s another contract at stake: In July, the MDTA issued an RFP for the general engineering consultant, who will serve as the agency’s engineering representative. The agency expects to award the $75 million contract in January 2025, according to the statement.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticlePolice car, JCB Excavator, Construction Vehicles catch thief – Toy for kids
Next Article Excellent Hitachi Excavator for sale
Machinery Asia
  • Website

Related Posts

Bulldozer incident halts Pennsylvania demolition project

March 4, 2026

Data centers propelled Turner to record $29.2 billion in revenue by 2025

March 3, 2026

Excavator incident halts PA demolition project

March 3, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Bulldozer incident halts Pennsylvania demolition project

Data centers propelled Turner to record $29.2 billion in revenue by 2025

Excavator incident halts PA demolition project

Warehouse conversions raise questions about IBC and floodplain compliance

Popular Posts

Bulldozer incident halts Pennsylvania demolition project

March 4, 2026

Data centers propelled Turner to record $29.2 billion in revenue by 2025

March 3, 2026

Excavator incident halts PA demolition project

March 3, 2026

Warehouse conversions raise questions about IBC and floodplain compliance

March 3, 2026
Heavy Machinery

Buying guide for open aluminum trailers for long-distance vehicle transport

March 3, 2026

How to choose the right car trailer tool box

March 3, 2026

What is the safest speed for hauling car trailers

February 28, 2026

Aluminum car transport trailer for long distance towing and transport of heavy vehicles

February 25, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.