Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » PCL takes on rehabilitation of California wastewater facilities
Industry News

PCL takes on rehabilitation of California wastewater facilities

Machinery AsiaBy Machinery AsiaSeptember 4, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Award: Renovation and expansion of waste water treatment facilities
Value: $600 million (total project value)
Location: San Diego
Customer: US Section of the International Water and Boundary Commission

Construction firm PCL will design and build the rehabilitation and expansion of a water treatment facility in San Diego, according to an August 28 news release of the builder. The total cost of the project is estimated at 600 million dollars. The United States Section of the International Boundary and Water Commission awarded the contract to PCL.

After winning the progressive design and construction contract for South Bay International’s wastewater treatment plant, PCL chose Edmonton, Alberta-based Stantec to lead the design. A Canadian-based contractor, PCL has its US headquarters in Denver.

The project will provide SBIWTP with essential rehabilitation of its existing infrastructure and double its treatment capacity to 50 million gallons per day, with a maximum hydraulic flow capacity of 75 million gallons per day, according to the builder. The plant will remain in operation throughout the design and construction.

The $42.4 million first phase will cover Stantec’s large-scale design for the expansion and rehabilitation of the plant, which PCL expects to complete in 20 months. After design, PCL expects construction to take about five years, according to the company.

“With decades of experience in sewage construction, we bring a deep understanding of the complexities involved in projects of this scale,” said Ankur Talwar, District Manager, Civil Infrastructure Division, PCL, in the communicated

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous Article2012 Case CX210B Excavator
Next Article 2 ton excavator digs out 3,000lb rock!!!
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.