Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » 2024 Top 400 Sourcebook: Pittsburgh Bridge Planned Slideshow
Industry News

2024 Top 400 Sourcebook: Pittsburgh Bridge Planned Slideshow

Machinery AsiaBy Machinery AsiaSeptember 20, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

It is being built to replace the Commercial Street Bridge, an 861-foot-long open concrete arch structure that rises up to 85 feet above Nine Mile Run and Frick Park in Pittsburgh, Pennsylvania. Built in 1951, the four-lane bridge is integral. part of I-376/Parkway East, one of the busiest highways in western Pennsylvania with nearly 100,000 vehicles per day.

With the aging bridge already load-restricted due to structural deterioration, the Pennsylvania Department of Transportation and designer HDR evaluated a variety of methods for design-bid-build replacement. The accelerated bridge construction coupling technique was considered the best option to accommodate the topographical and alignment constraints.

17 M
US freight cars and intermodal units for the first 36 weeks of 2024

Source: Association of American Railroads

Joseph B. Fay Co., Pittsburgh, will build the 825-foot-long, 80-foot-wide arched delta frame structure on temporary foundations. During a planned 25-day closure of the motorway in the summer of 2026, Fay will remove the old bridge using conventional and explosive demolition techniques, then put the £19m replacement in its place.

The $95 million project, scheduled for completion next year, will include lowering a nearby interchange ramp to increase vertical clearance under the freeway, relocating the sanitary sewer line , guide updates and the installation of traffic management technology.

The construction crew will also restore disturbed areas of Frick Park, which extends about a mile north across the Fern Hollow Bridge. This structure collapsed dramatically in January 2022 and reopened in less than a year after an accelerated reconstruction effort.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleCheapest Chinese excavator mini
Next Article Built in Quality: Cat® Mini Excavators Manufactured in Wujiang, China
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.