Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » TC Energy’s new $11 million Canada gas line fined $1 million for site erosion
Industry News

TC Energy’s new $11 million Canada gas line fined $1 million for site erosion

Machinery AsiaBy Machinery AsiaSeptember 23, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Coastal Gas Link, the recently completed 670 km pipeline that will transport natural gas from northern British Columbia to Canada’s first giant coastal gas export terminal in Kitimat, BC, which will begin commercial operations next year , has been fined more than $1 million. for failing to control erosion during construction and breaching preventative agreements, the province’s regulators said.

British Columbia’s Office of Environmental Assessment issued 10 administrative penalties on Sept. 11 totaling nearly $435,000 against the pipeline, which is owned by Calgary, Alberta-based TC Energy and investors. It will provide gas to the $14 billion first phase of Canada’s LNG terminal, owned by a consortium led by Shell and now about 95 percent with Fluor Corp. as the main construction contractor.

“Recurring problems during the construction of the pipeline led to an escalation of enforcement measures,” regulators said in a statement. The pipeline previously received five environmental fines totaling $600,000.

The fines stem from violations first documented in the spring of 2023, which followed media reports of snowmelt causing significant erosion and sediment control problems along the construction route of the pipeline

“As soon as these issues were identified, we took immediate and decisive action to correct them,” TC Energy said in a statement. “Since the fall of 2023, Coastal GasLink has been fully and consistently [requirements].”

The gas line has begun supplying the Canada LNG facility, which has said it would begin sending liquefied gas to the Kitimat terminal in mid-2025. It is also scheduled to send gas to the estimated 4 billion dollars from Cedar LNG, a Haisla Nation-led export project with nearby Pembina Pipeline Corp. that made its final investment decision this summer and is now under construction by Black & Veatch and Samsung Heavy Industries .

Set to be operational by the end of 2028, it would be a floating LNG facility with a projected capacity of around 2.3 million metric tons per year.

LNG Canada has not yet announced a final investment decision to build a second phase, saying it “continues to work to achieve the necessary conditions for its five joint venture participants to reach” that point, particularly the costs of whether to use fossil fuels or electricity to feed. the second installation.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleKomatsu iMC Intelligent Excavator
Next Article Kubota KX-018 – The Most Versatile Piece of Equipment You Can Own
Machinery Asia
  • Website

Related Posts

Construction views to the east | Engineering News-Register

May 13, 2026

Romania’s $4.7bn offshore gas project is set to make it EU’s biggest producer, overtaking Russia

May 13, 2026

The structural engineering code review team prepares a carbon reduction report

May 13, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Which open vs enclosed car trailer makes sense for you

Construction views to the east | Engineering News-Register

Romania’s $4.7bn offshore gas project is set to make it EU’s biggest producer, overtaking Russia

The structural engineering code review team prepares a carbon reduction report

Popular Posts

Which open vs enclosed car trailer makes sense for you

May 13, 2026

Construction views to the east | Engineering News-Register

May 13, 2026

Romania’s $4.7bn offshore gas project is set to make it EU’s biggest producer, overtaking Russia

May 13, 2026

The structural engineering code review team prepares a carbon reduction report

May 13, 2026
Heavy Machinery

Which open vs enclosed car trailer makes sense for you

May 13, 2026

How to secure a car on a trailer safely step by step

April 30, 2026

Folding car trailer buying guide for small garage and easy storage

April 27, 2026

How does car trailer size affect towing capacity

April 17, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.