Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Award of Merit, Health Care: Louis and Phyllis Friedman Building
Industry News

Award of Merit, Health Care: Louis and Phyllis Friedman Building

Machinery AsiaBy Machinery AsiaOctober 12, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Louis and Phyllis Friedman Building

Towson, Md.

Merit Award


Sent by: DPR construction

Owner: Greater Baltimore Medical Center

Main design company: Hord Coplan Power Inc.

General contractor: DPR construction

Civil Engineer: Site Resources

Structural Engineer: Morabito Consultants

MEP Engineer: WSP

Owner Representative and Program Manager: Hammes Healthcare




The first phase of the medical center’s Project Promise, a three-story expansion of the existing hospital, includes a 120,000-square-foot addition that serves as the building’s new main entrance. The light-filled atrium acts as a natural orientation element, guiding visitors to the main corridor and elevators. Modifying the roof design, using stone dust as infill in the atrium, and obtaining alternative elevator manufacturers saved $850,000.

The deep foundations of the 1960s building were located closer to the surface than expected. Bracing of sections was required to support the load, causing a delay. The work was resequenced to accommodate the structural challenges.

The structural overhang of the roof was tied into the building above the occupied hospice wards which had to be vacated before the demolition. Operational changes allowed only two empty rooms at a time. Temporary protection controls water intrusion and noise, with hearing protection provided to patients, families and staff.

The $73 million project was completed in 29 months, on budget and on schedule.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleOctober 2024 City Scoop: Riverside
Next Article Industry News: The WSDOT SR 167 Expressway project is moving forward
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.