Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Industry News: The WSDOT SR 167 Expressway project is moving forward
Industry News

Industry News: The WSDOT SR 167 Expressway project is moving forward

Machinery AsiaBy Machinery AsiaOctober 12, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The Washington State Department of Transportation (WSDOT) has awarded Guy F. Atkinson Inc. a $177.7 million project to build the next portion of state Highway 167. The contract, awarded in August, is the third of four to build the toll road. The work involves widening SR 167 from SR 161/North Meridian Avenue in Puyallup to SR 410 near Sumner. The fourth and final phase of the project is expected to be awarded next year. When completed in 2029, a six-mile, $2.69 billion tollway will connect Puyallup and the Port of Tacoma.

$107 million awarded for West Coast charging stations

The U.S. Department of Transportation has awarded California, Oregon and Washington a $107 million grant to install hydrogen truck refueling and fueling stations along Interstate 5 and other corridors. key commodities The funding, announced in August, will help develop a multi-state West Coast corridor that will drive emissions-free freight movement. The funding is part of the Jobs and Infrastructure Investment Act of 2021. Construction of the new charging stations is expected to begin in 2026.

Contract awarded by Santa Barbara HOV Lanes

Granite Construction has been awarded a $38 million contract to add busy rush hour lanes and reconstruct all elements of the existing 101 Freeway south of Santa Barbara. This is the sixth segment of a 7.5-mile extension of the 101 Freeway’s HOV lanes awarded to the company. Caltrans and the Santa Barbara County Association of Governments are developing the $585.4 million project.

Corps launches project for sustainable barracks

The US Army Corps of Engineers has launched a $100 million project to build a set of new barracks using sustainable materials at Joint Base Lewis-McChord in Washington. The base was selected for the Sustainable Building Materials Pilot Program outlined in the National Defense Authorization Act of 2022 from a group of 130 Army installations. The overall goal of the project is to reduce the carbon incorporated in construction by at least 30%. USACE Seattle District is managing the architectural design and will leverage its in-house design, engineering and architecture expertise with support from the US Army Engineer Research and Development Center research laboratory.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAward of Merit, Health Care: Louis and Phyllis Friedman Building
Next Article Best Project, Higher Education/Research: Carnegie Mellon University Forbes & Beeler Residence Hall
Machinery Asia
  • Website

Related Posts

States push data center breaks to buy time to measure impacts

March 1, 2026

Why an Army Veteran Took Kiewit to Court: PTSD and Mental Health

March 1, 2026

Construction views to the east | Engineering News-Register

February 28, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

States push data center breaks to buy time to measure impacts

Why an Army Veteran Took Kiewit to Court: PTSD and Mental Health

Construction views to the east | Engineering News-Register

What is the safest speed for hauling car trailers

Popular Posts

States push data center breaks to buy time to measure impacts

March 1, 2026

Why an Army Veteran Took Kiewit to Court: PTSD and Mental Health

March 1, 2026

Construction views to the east | Engineering News-Register

February 28, 2026

What is the safest speed for hauling car trailers

February 28, 2026
Heavy Machinery

What is the safest speed for hauling car trailers

February 28, 2026

Aluminum car transport trailer for long distance towing and transport of heavy vehicles

February 25, 2026

Why your white utility trailer rusts too quickly and how to choose one that really lasts

February 25, 2026

Best winch for car trailer

February 24, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.