Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Award of Merit, Road/Bridge: Wellsburg Bridge
Industry News

Award of Merit, Road/Bridge: Wellsburg Bridge

Machinery AsiaBy Machinery AsiaOctober 12, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Wellsburg Bridge

Brilliant, Ohio, and Wellsburg, W.Va.

Merit Award


Sent by: Flatiron Constructors Inc.

Owner: West Virginia Department of Transportation

Main design company: RS&H

General contractor: Flatiron Construction.

Structural Engineer: COWI Consulting Inc.




A tied arch bridge floated a mile down the Ohio River in April 2021, marking the first time this method had been used to install a West Virginia bridge. It was also the heaviest floating bridge lift ever executed in the US

The cable-stayed arch bridge was built off-site, upstream, after two existing old spans outlived their useful life. The 1,850-foot-long bridge spans 830 feet and connects Route 2 in West Virginia, near Wellsburg, to Route 7 (R7) in Brilliant, Ohio, providing an important and reliable artery for both communities.

Wellsburg Bridge

Photo courtesy of Flatiron Construction Inc.

The five-year, $148 million project also included construction of a mile-long pile and panel retaining wall, as well as road improvements.

The tied arch structure of the net weighed more than 4,000 tons. Four barges and a custom lifting system supported the span during floating and lifting to permanent docks. Authorities gave the team a 72-hour window to float the bridge with the river closed to all boat traffic.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Project, Road/Bridge: Delaware Memorial Bridge Deck Rehabilitation Project
Next Article Merit Award, Health Care: Center for Specialized Care in Child Health and Ambulatory Surgery of Nemours
Machinery Asia
  • Website

Related Posts

States push data center breaks to buy time to measure impacts

March 1, 2026

Why an Army Veteran Took Kiewit to Court: PTSD and Mental Health

March 1, 2026

Construction views to the east | Engineering News-Register

February 28, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

States push data center breaks to buy time to measure impacts

Why an Army Veteran Took Kiewit to Court: PTSD and Mental Health

Construction views to the east | Engineering News-Register

What is the safest speed for hauling car trailers

Popular Posts

States push data center breaks to buy time to measure impacts

March 1, 2026

Why an Army Veteran Took Kiewit to Court: PTSD and Mental Health

March 1, 2026

Construction views to the east | Engineering News-Register

February 28, 2026

What is the safest speed for hauling car trailers

February 28, 2026
Heavy Machinery

What is the safest speed for hauling car trailers

February 28, 2026

Aluminum car transport trailer for long distance towing and transport of heavy vehicles

February 25, 2026

Why your white utility trailer rusts too quickly and how to choose one that really lasts

February 25, 2026

Best winch for car trailer

February 24, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.