Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป Merit Award, Health Care: Center for Specialized Care in Child Health and Ambulatory Surgery of Nemours
Industry News

Merit Award, Health Care: Center for Specialized Care in Child Health and Ambulatory Surgery of Nemours

Machinery AsiaBy Machinery AsiaOctober 12, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Center for specialized care in children’s health and ambulatory surgery in Nemours

Malvern, Pa.

Merit Award


Sent by: Turner Construction Co.

Owner: Nemours Child Health

Main design company: NORTH

Construction Manager: Turner Construction Co.

MEP Engineer: Barton Associates Inc.

Owner’s representative: Watchdog project management




Transforming a core and shell completed by another contractor into a medical facility involved enabling a 45,000 square meter specialty care space. The first floor is a center for specialty care areas including audiology, behavioral health, x-ray and ultrasound. The second floor supports advanced medical procedures, housing an ambulatory surgery center.

When the construction manager responsible for the core and shell unexpectedly had to replace the entire roof during Turner’s active fitout work below, the two teams collaborated to minimize disruption by scheduling the roof work around the clock of lower intensity and maintaining daily communication. The project integrated mechanical, electrical and plumbing systems, adding a rooftop unit and optimizing two existing ones. A new main distribution panel ensures efficient power distribution. The team also installed an emergency power backup system using a repurposed generator from a decommissioned Nemours site, ensuring reliable power for critical care areas. The $17.5 million, year-long project was completed on schedule and under budget by $200,000.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAward of Merit, Road/Bridge: Wellsburg Bridge
Next Article Best Project, Office/Retail/Mixed Use: 20 Massachusetts Avenue, NW
Machinery Asia
  • Website

Related Posts

Three workers die in tractor-trailer accident in California I-10 work zone

September 28, 2026

Fluor, Balfour Beatty Completes $677 Million Texas Highway Project

September 28, 2026

Aecon, AtkinsRealis lead Ontario’s $19 million Pickering nuclear power plant overhaul

September 28, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Custom trailers designed for the way you work

Three workers die in tractor-trailer accident in California I-10 work zone

Fluor, Balfour Beatty Completes $677 Million Texas Highway Project

Aecon, AtkinsRealis lead Ontario’s $19 million Pickering nuclear power plant overhaul

Popular Posts

Custom trailers designed for the way you work

September 29, 2026

Three workers die in tractor-trailer accident in California I-10 work zone

September 28, 2026

Fluor, Balfour Beatty Completes $677 Million Texas Highway Project

September 28, 2026

Aecon, AtkinsRealis lead Ontario’s $19 million Pickering nuclear power plant overhaul

September 28, 2026
Heavy Machinery

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

3-Car Wedge Trailer: How can it improve vehicle transportation efficiency?

September 21, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.