Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Best Project, Cultural/Cultural: UCLA Nimoy Theatre
Industry News

Best Project, Cultural/Cultural: UCLA Nimoy Theatre

Machinery AsiaBy Machinery AsiaOctober 15, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

UCLA’s Nimoy Theater

los angeles

BEST PROJECT


Sent by: Shawmut design and construction

Owner: University of California, Los Angeles

Main design company: BAR Architects & Interiors

Construction Manager: Shawmut design and construction

Civil Engineer: KPFF Consulting Engineers

Structural Engineer: Holmes structures

MEP Engineer: Interface engineering

Audio and visual consultant: The Shalleck Collaborative

Lighting Designer: HLB: Lighting design Horton Lees Brogden

Acoustic engineer: Charles M. Salter Associates Inc.

Owner’s representative: Page and Turnbull

Code and Fire Protection Consultant: Woden’s Fire

Elevator consultant: VDA (Van Deusen & Associates)

Covers and waterproofing: Simpson Gumpertz & Heger Inc.

Cost Estimator: cumming corp.

Specifications: Specifications West LLC




After a $24 million renovation, the historic Crest Theater has been meticulously transformed into the state-of-the-art UCLA Nimoy Theater, reclaiming a cultural landmark on Westwood Boulevard and honoring the legacy of actor and philanthropist Leonard Nimoy . Certified LEED Gold, the Nimoy project has not only achieved important sustainability milestones, but has also reinforced the importance of historic preservation, community engagement and environmental responsibility.

The Crest first opened in 1940 and was redesigned in the 1980s, but many of the original theater’s iconic features have been preserved and enhanced, including the 230-foot-long mural depicting Los Angeles in the 1930s , created by performing artist Bill Anderson. Art restoration specialists were hired to meticulously clean and restore the mural, ensuring it retained its original vibrancy and detail.

The Nimoy is a 299-seat, 10,500-square-foot venue with a versatile performance space, including 150 permanent seats and flexible configurations for up to 299 attendees. The 35-foot-wide stage has an adjustable depth. A modern in-line array audio system provides superior sound quality and uniform coverage throughout the venue, while an LED-based performance lighting system offers energy efficiency and customizable effects. Other highlights of the renovation include an expanded lobby, bar, seating areas and gender-inclusive bathrooms.

To reinforce the integrity of the original 1940s structure while preserving its historic facade, the project team used modern materials and techniques that did not alter the appearance of the building, but provided the support required for the new design.

Creating a versatile performance space with flexible seating was another major challenge. The solution involved installing pneumatic seat risers that could be easily reconfigured to accommodate various seating arrangements, from cabaret tables to standing room. Advanced energy modeling provided a comprehensive understanding of the building’s energy use, leading to the implementation of submeters for all end uses, including lighting, HVAC and fan power. The teams completed the work on budget and on time in September 2023.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleA fifth of construction workers do not have permanent legal staff. Can the next president change that?
Next Article Hoover gets money from CHIPS for NYC facilities
Machinery Asia
  • Website

Related Posts

DC Encourages Small Business Involvement in RFK Stadium Site Redevelopment

March 3, 2026

Enbridge Begins Construction on $450 Million Line 5 Relocation in Northwest Wisconsin

March 3, 2026

Building Safeguards: A Deeper Look at Cyber ​​Security in the Construction Industry

March 3, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

DC Encourages Small Business Involvement in RFK Stadium Site Redevelopment

Enbridge Begins Construction on $450 Million Line 5 Relocation in Northwest Wisconsin

Building Safeguards: A Deeper Look at Cyber ​​Security in the Construction Industry

How to use a trench

Popular Posts

DC Encourages Small Business Involvement in RFK Stadium Site Redevelopment

March 3, 2026

Enbridge Begins Construction on $450 Million Line 5 Relocation in Northwest Wisconsin

March 3, 2026

Building Safeguards: A Deeper Look at Cyber ​​Security in the Construction Industry

March 3, 2026

How to use a trench

March 3, 2026
Heavy Machinery

Buying guide for open aluminum trailers for long-distance vehicle transport

March 3, 2026

How to choose the right car trailer tool box

March 3, 2026

What is the safest speed for hauling car trailers

February 28, 2026

Aluminum car transport trailer for long distance towing and transport of heavy vehicles

February 25, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.