Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Best Project, Renovation/Restoration: Adaptive Reuse of the USC United University Church for the School of Dramatic Arts
Industry News

Best Project, Renovation/Restoration: Adaptive Reuse of the USC United University Church for the School of Dramatic Arts

Machinery AsiaBy Machinery AsiaOctober 17, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

USC United University Church Adaptive Reuse for School of Dramatic Arts

los angeles

BEST PROJECT


Sent by: Perkins Eastman | Pfeiffer

Owner: University of Southern California

Main design company: Perkins Eastman | Pfeiffer

General contractor: Construction MATT

Civil Engineer: KPFF

Structural Engineer: Nabih Yousef & Associates

MEP Engineer: Affiliated Engineers Inc.

Architectural lighting: Pivot lighting design

Theater consultant: DNA Theatre




An adaptive reuse project has transformed USC’s historic 1931 United University Church into the new home of its School of Dramatic Art (SDA).

The scope of work for this two-year effort included the conversion of the existing building’s main chapel, with its arches, double arches and plaster detailing, into a theater space, while maintaining the original character and defining features of the building.

The chapel had minimal infrastructure, but the teams had to add a significant number of new systems within the limited space of the building’s existing walls, including seismic bracing and modern electrical, mechanical and plumbing that would support sustainability goals.

Historical drawings from the 1930s did not represent what was actually built. Unplanned structural elements include beams and columns. To overcome this challenge, the team used a laser point cloud scanner to create an accurate 3D model of the existing structure, which was then cross-referenced with the design team’s model, ensuring placement and the precise alignment of the new infrastructure while preserving the previously existing geometry. .

USC United University Church Adaptive Reuse for School of Dramatic Arts

Photo by Stephanie Kingsnorth

The design and construction teams ensured that all new systems were installed compactly and efficiently to fit within the limited space of the chapel. The team used detailed coordination and innovative engineering solutions to seamlessly blend the new infrastructure with the historic fabric, while maintaining the aesthetic and structural integrity of the chapel.

The lower level sanctuary and gathering space became performance areas, while the design added space for consolidated programs, including rehearsal and backstage areas, teaching and student facilities, and offices

The sanctuary’s original cast stone details, heavy wooden trusses and light fixtures were carefully restored while the architectural and structural elements were enhanced.

Although the design called for replacing the building’s steel windows, doing so would have been cost and time prohibitive. Instead, the team reused and updated the existing windows to meet modern energy requirements while retaining their historic appearance by removing the panes and replacing them with new, more thermally efficient glass.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Project, Higher Education/Research: MiraCosta College Health and Wellness Hub
Next Article Award of Merit, Healthcare: CSMC Marina Towers Breast Imaging
Machinery Asia
  • Website

Related Posts

Despite “widespread industry disruption, unions report membership growth.”

February 15, 2026

New obstacles have been seen in a Potomac River sewage spill solution

February 14, 2026

Boston women’s soccer stadium price tag soars to $325 million

February 13, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Despite “widespread industry disruption, unions report membership growth.”

TYPHON Machinery Named eBay Exporter of the Year 2025, Cementing Its Leadership in Global Compact Equipment

New obstacles have been seen in a Potomac River sewage spill solution

Boston women’s soccer stadium price tag soars to $325 million

Popular Posts

Despite “widespread industry disruption, unions report membership growth.”

February 15, 2026

TYPHON Machinery Named eBay Exporter of the Year 2025, Cementing Its Leadership in Global Compact Equipment

February 14, 2026

New obstacles have been seen in a Potomac River sewage spill solution

February 14, 2026

Boston women’s soccer stadium price tag soars to $325 million

February 13, 2026
Heavy Machinery

30ft boat trailer for heavy offshore vessels and road trailer

February 12, 2026

Aluminum trailer car

February 9, 2026

Hydraulic tilting trailer kit

February 9, 2026

Why car trailer weight is so important for safe towing

February 4, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.