Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Award of Merit, Healthcare: CSMC Marina Towers Breast Imaging
Industry News

Award of Merit, Healthcare: CSMC Marina Towers Breast Imaging

Machinery AsiaBy Machinery AsiaOctober 17, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Breast image CSMC Marina Towers

Marina Del Ray, Calif.

Merit Award


Sent by: TIS Construction Services Inc.

Owner: Cedars-Sinai Medical Center

Main design company: Abramson Architects

General contractor: TIS Construction Services Inc.

MEP Engineer: LAM + TEA Engineering

Lighting design: Alan Noelle Engineering


Subcontractors: Acco Engineering Systems; Cosco Fire Protection Inc.; Crabtree Glass Co.; DeepScan Inc.; Duggan & Associates Inc.



Located on the first floor of Cedars-Sinai Marina Towers, this new breast imaging center is strategically designed to meet the high technical standards of both Cedars-Sinai and the facility’s affiliated user group, ensuring seamless integration of services. The project features a prominent lobby that sets the tone for the entire space, creating a cohesive design language that unites the Torres Marina master plan.

During demolition, crews encountered numerous overhead obstructions, from existing walkways to electrical conduit and water pipes obstructing specified ceiling heights. The field team identified these issues and relayed them to the project management team and architects. These open lines of communication ensured that unnecessary obstructions were demolished, while others were moved or adjusted to fit the project plan.

When faced with an existing uneven concrete slab in the reception area, the contractor worked closely with the design team, who ultimately recommended replacing the existing slab. The teams managed to complete the placement in just two weeks, working nights and weekends to maintain the schedule.

The project team’s collaborative approach to various challenges helped complete the installation within one month and on budget in early April 2024.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Project, Renovation/Restoration: Adaptive Reuse of the USC United University Church for the School of Dramatic Arts
Next Article Award of Merit, Office/Retail/Mixed Use: 843 N Spring Street
Machinery Asia
  • Website

Related Posts

Despite “widespread industry disruption, unions report membership growth.”

February 15, 2026

New obstacles have been seen in a Potomac River sewage spill solution

February 14, 2026

Boston women’s soccer stadium price tag soars to $325 million

February 13, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Despite “widespread industry disruption, unions report membership growth.”

TYPHON Machinery Named eBay Exporter of the Year 2025, Cementing Its Leadership in Global Compact Equipment

New obstacles have been seen in a Potomac River sewage spill solution

Boston women’s soccer stadium price tag soars to $325 million

Popular Posts

Despite “widespread industry disruption, unions report membership growth.”

February 15, 2026

TYPHON Machinery Named eBay Exporter of the Year 2025, Cementing Its Leadership in Global Compact Equipment

February 14, 2026

New obstacles have been seen in a Potomac River sewage spill solution

February 14, 2026

Boston women’s soccer stadium price tag soars to $325 million

February 13, 2026
Heavy Machinery

30ft boat trailer for heavy offshore vessels and road trailer

February 12, 2026

Aluminum trailer car

February 9, 2026

Hydraulic tilting trailer kit

February 9, 2026

Why car trailer weight is so important for safe towing

February 4, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.