Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป Award of Merit, Landscape/Urban Development: Wilmington Waterfront Promenade and Building Demolition
Industry News

Award of Merit, Landscape/Urban Development: Wilmington Waterfront Promenade and Building Demolition

Machinery AsiaBy Machinery AsiaOctober 17, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Wilmington Waterfront and Building Demolition

los angeles

Merit Award


Sent by: Port of Los Angeles

Owner: Port of Los Angeles

Main design company: Sasaki Associates Inc.

General contractor: Sully-Miller Contracting Co.


Subcontractors: Blue Iron Foundations & Shoring LLC; Bulldog Paving; CMB Structures Inc.; CMC Rebar West; Elecnor Belco Electric Inc.



Ten acres of previously vacant industrial property has been transformed into green open space, a public plaza and 1,400 linear feet of waterfront as part of this $51.9 million project. A footbridge connects the boardwalk to other new features, including an observation pier, floating landing and a children’s playground.

The scope of work included the realignment of Water Street, including underground facilities, and the reconstruction of the seawall at berths 182 to 186, including the installation of a steel pile wall. Crews also completed asbestos abatement and lead remediation in 10 buildings, rebuilt rock revetment, placed tidestone and installed prestressed concrete piles. The project team adopted low-impact development, installing various seepage basins, bioswaves, vegetation and permeable pavers throughout the project. These elements minimized stormwater runoff and promoted groundwater recharge. All of the project’s multiple phases and milestones were delivered on time and without any impact on the planned opening date of February 2024. Although some parts of the project were delayed by the pandemic, the project team developed solutions to avoid these delays to ensure critical project deliverables were completed on schedule.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Project, Office/Retail/Mixed Use: 4930 Directors Place
Next Article Project of the Year Finalist: Sonoma Academy Community Performing Arts Center
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.