Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป From the ENR Archive: 27 July 1933
Industry News

From the ENR Archive: 27 July 1933

Machinery AsiaBy Machinery AsiaOctober 24, 2024No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

ENR 150th anniversary

This 1933 cover photo shows workers maneuvering a bomb into position on a platform in San Francisco Bay at a very early stage of the Golden Gate Bridge project.

The location of the bridge’s south pier, 1,000 feet offshore, was in water 50 feet to 60 feet deep.

Plans called for removing 30,000 cubic yards of rock to reach a depth of 100 feet. A six-man crew worked from a 42-foot x 140-foot barge with tower towers and winches operating cables attached to six 5-ton anchors.

The 5,000-pound bomb consisted of a 20-foot-long, 8-inch-diameter steel tube containing about 2 tons of concrete that on impact would activate the firing pin to set off the 250 pounds of high explosive.

A steel tube 14 inches in diameter, with steel legs at the bottom, known as a bombardment gun, was fitted and used to aim each bomb.

The bombs were aimed at 20-foot intervals and then the shattered serpentine rock was removed from the bay by shell dredges.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleJudge: China Construction owes Baha Mar developer $1.6 million
Next Article Matterport Reality Capture sees gains in larger projects
Machinery Asia
  • Website

Related Posts

A judge orders CTA funding restored so rail projects avoid demobilization

March 27, 2026

Brooklyn’s public libraries are undergoing a massive wooden reconstruction

March 27, 2026

Brooklyn Public Libraries Try Solid Wood

March 27, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

A judge orders CTA funding restored so rail projects avoid demobilization

Brooklyn’s public libraries are undergoing a massive wooden reconstruction

Brooklyn Public Libraries Try Solid Wood

The hidden risks of promoting unprepared leaders in construction

Popular Posts

A judge orders CTA funding restored so rail projects avoid demobilization

March 27, 2026

Brooklyn’s public libraries are undergoing a massive wooden reconstruction

March 27, 2026

Brooklyn Public Libraries Try Solid Wood

March 27, 2026

The hidden risks of promoting unprepared leaders in construction

March 26, 2026
Heavy Machinery

Car Trailer vs Equipment Trailer How to choose the right one

March 26, 2026

Car trailer with hydraulic drop cover makes loading faster and safer

March 23, 2026

Car trailer turn box guide for safe and efficient towing

March 20, 2026

How much weight can a flatbed car transporter trailer carry?

March 16, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.