Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Best Residential/Hospitality — Global Ambassador | Engineering News-Register
Industry News

Best Residential/Hospitality — Global Ambassador | Engineering News-Register

Machinery AsiaBy Machinery AsiaOctober 29, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The world ambassador

phoenix

BEST PROJECT


Sent by: Oakland construction

Owner: Fox Hotel 1 LLC/Common Bond Development Group

Main design company: Nelson Partners

General contractor: Oakland construction

Civil Engineer: Wooden patel

Structural Engineer: Associates PK

MEP Engineer: Energy Systems Design

Landscape designer: Berghoff Design Group

Interior Designer: Testani Design Troupe

Subcontractors: Apodaca Wall Systems; Specified Electrical Contractors Inc.; AEC solutions; Fulcrum Co.; Iron Horse Cos.; Recreate Body.



One of Phoenix’s newest luxury hotels features 141 guest rooms spread over five floors and five signature restaurants with the backdrop of Camelback Mountain. The 200,000-square-foot structure includes a 9,000-square-foot members’ club and wellness center, with one of five restaurants occupying an 18,000-square-foot rooftop. Rooms range from 460 square feet to 2,000 square feet.

Teamwork proved essential when incorporating additional structural modifications and interior design features. These improvements included the transformation of a planned rooftop mechanical patio into an event space, the installation of custom-designed architectural elements, and the addition of specialized interior finishes to achieve a distinct international aesthetic.

The world ambassador

Photo by Kevin Brost

Regular meetings and detailed documentation helped inform decision-making and alignment on project priorities. This collaborative approach also allowed the project team to adjust construction sequencing, optimize workflow efficiency, and mitigate any unforeseen complexities arising from the additional scope without compromising the overall integrity of the project.

Integrating these changes into the existing construction schedule also required meticulous planning. Extensive evaluations and discussions with business partners and suppliers ensured that all materials matched up-to-date design specifications.

Accommodating the project’s growing scope and new design improvements extended the original substantial completion date, but this decision was carefully reviewed and approved by the owner. The project was delivered in April 2024 after about 2.5 years of construction.

The world ambassador

Photo by Kevin Brost

High-quality materials and finishes sourced from around the world included brass fixtures, white brick, antique plastered ceilings and marble floors, which elevated the hotel’s design aesthetic.

For the exterior of the building, the design team chose to use an insulated masonry veneer system that incorporates continuous insulation and an air and water resistant barrier.

A high-strength fixing bed mortar adheres to the thin brick veneer without the use of mechanical fasteners, which will reduce thermal bridging. This will help reduce energy consumption and better maintain indoor temperatures throughout the year.

The world ambassador

Photo by Kevin Brost

The project team’s use of building information modeling helped ensure accurate installation of the hotel’s complex architectural elements and mechanical systems. Augmented reality also helped increase stakeholder engagement by enabling real-time visualization of design concepts and construction progress, encouraging informed decision-making and promoting transparency.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest K-12 — Geneva Eps Mosley Middle School
Next Article Construction Partners buys Lone Star Paving for $654 million, 3 million shares
Machinery Asia
  • Website

Related Posts

MTA invested a record $15.8 million in capital projects last year

February 3, 2026

DC Utility Pushes to Fix Up to 300 Million Gal Potomac River Sewage Spill

February 3, 2026

A traffic-oriented development bill presented to Congress

February 3, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

MTA invested a record $15.8 million in capital projects last year

How to choose a smart car trailer

DC Utility Pushes to Fix Up to 300 Million Gal Potomac River Sewage Spill

Galvanized tilting trailer for the transport of cars and equipment

Popular Posts

MTA invested a record $15.8 million in capital projects last year

February 3, 2026

How to choose a smart car trailer

February 3, 2026

DC Utility Pushes to Fix Up to 300 Million Gal Potomac River Sewage Spill

February 3, 2026

Galvanized tilting trailer for the transport of cars and equipment

February 3, 2026
Heavy Machinery

How to choose a smart car trailer

February 3, 2026

Galvanized tilting trailer for the transport of cars and equipment

February 3, 2026

Car hauler trailer kit basics for real world towing

January 26, 2026

Hydraulic tilting gooseneck trailer for transporting heavy equipment

January 26, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.