Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Best Office/Retail/Mixed Use – Headquarters of the United Community
Industry News

Best Office/Retail/Mixed Use – Headquarters of the United Community

Machinery AsiaBy Machinery AsiaOctober 30, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Headquarters of the United Community

Greenville, SC

BEST PROJECT


Sent by: Harper General Contractors

Owner: The Furman Co.

Main design company: McMillan Pazdan Smith

General contractor: Harper General Contractors

Civil and structural engineer: Britt Peters & Associates

MEP Engineer: RMF Engineering

Landscape architect: Designed and developed by Sexton




To build the 117,000-square-meter United Community headquarters, crews partially excavated a rock outcrop so the structure could be etched into the ground. The cast-in-place concrete structure houses four floors of Class A executive office space with a flagship branch extending from the footprint of the main structure.

The skin consists of curtain wall, storefront, aluminum composite material, terracotta panels, corrugated panels and a vegetation screen. The office tower also features rooftop terraces that include paver patios with landscaped planters. The interior is highlighted by a grand monumental staircase built with mahogany steps and glass railings that connects the fourth to the sixth floor.

Headquarters of the United Community

Photo by Brian Knox Photography

From the start of the project, challenges arose that Harper General Contractors had to mitigate. There were unforeseen and inadequate site conditions that forced the team to change the structural foundations during construction. The design team, the structural engineer, and Harper decided to incorporate rigid inclusions and micropiles, and adjusted the foundation design with shotcrete and soil nailing. The overall schedule was affected by four weeks, but the team was eventually able to bring the project back on schedule.

The team faced delays in the arrival of material and equipment during the COVID-19 pandemic. The HVAC units arrived three months late, which affected work on the millwork, flooring and ceilings. The transformer was delayed by six months. Harper hosted weekly calls and reworked site logistics to mitigate project impacts. During construction, Portugal’s terracotta manufacturer closed its doors. Harper worked with his business partners and design team to identify a new manufacturer. Despite all these challenges, the project was delivered on budget and on schedule.

“[Harper’s] the execution of the construction process, the attention to detail and the high-touch communication process gave us the confidence we needed during an uncertain time,” recalls Robert Poppleton, vice president of The Furman Co., the project developer .

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleFinalist for Best Manufacturing and Project of the Year – United Therapeutics Phase 5 cGMP Warehouse
Next Article Best Renovation/Restoration – Georgia Aquarium Café Renovation
Machinery Asia
  • Website

Related Posts

Merit Award, Specialized Construction: GeoBarrier System at the Furama Riverfront Hotel

December 14, 2025

Best Project, Government Building: New Consulate General of the United States in Merida | The project team overcomes the unexpected

December 14, 2025

Best Project, Sports/Show: Santiago Bernabéu Stadium

December 14, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Merit Award, Specialized Construction: GeoBarrier System at the Furama Riverfront Hotel

Best Project, Government Building: New Consulate General of the United States in Merida | The project team overcomes the unexpected

Best Project, Sports/Show: Santiago Bernabéu Stadium

Merit Award, Power/Industrial: Combined Cycle Implementation at the Santa Cruz Thermoelectric Power Plant

Popular Posts

Merit Award, Specialized Construction: GeoBarrier System at the Furama Riverfront Hotel

December 14, 2025

Best Project, Government Building: New Consulate General of the United States in Merida | The project team overcomes the unexpected

December 14, 2025

Best Project, Sports/Show: Santiago Bernabéu Stadium

December 14, 2025

Merit Award, Power/Industrial: Combined Cycle Implementation at the Santa Cruz Thermoelectric Power Plant

December 13, 2025
Heavy Machinery

Aluminum car trailer

December 2, 2025

Wheel Dozer vs. Crawler Dozer

November 20, 2025

Where can I find reliable mini excavator dealers near me?

October 27, 2025

The complete expert guide to faster and smarter cargo transportation

October 27, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.