Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Best Project, K-12: Pentucket Regional Middle High School
Industry News

Best Project, K-12: Pentucket Regional Middle High School

Machinery AsiaBy Machinery AsiaNovember 12, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Pentucket Regional High School

West Newbury, Mass.

BEST PROJECT


Sent by: WT Rich Co.

Owner: Pentucket Regional School District

Main design: Dore + Whittier Architects

General contractor: WT Rich Co.

Civil Engineer: Nitsch Engineering

Structural Engineer: Engineers Design Group Inc.

MEP Engineer: Vanderweil Engineers

Fire Protection Engineer: VAV International

Owner’s representative: The Vertex Cos.




Located on a hill with a former football field at a lower elevation, the site for the three-story, 212,000-square-foot building complicated a project that was already challenged by the proximity of the existing high school. In addition to implementing workplace safeguards, the project team’s analysis of sorting approaches optimized site logistics and streamlined material reuse, ultimately reducing management handling and disposal costs of the floor by more than $700,000.

From the outset, the work was affected by adverse weather conditions such as strong wind and rain. To maintain momentum and safeguard progress, the team applied innovative solutions such as the use of industrial shrink wrap for waterproofing. At the other extreme, drought-related pressures on the municipal water system required a rapid area-wide conservation response, such as leveraging on-site wells and implementing robust water control measures. the erosion

Pentucket Regional High School

Photo courtesy of WT Rich Co.

Early morning starts and late afternoon finishes were critical to achieving milestones under budget and ahead of schedule. Substantially completed in time for the 2022-23 school year, the unified campus serves 1,250 middle and high school students and displays a distinctive combination of exposed wood and steel structural elements. A two-story wing housing students in grades 7 and 8 and a three-story wing for students in grades 9-12 are joined by a large lobby and common dining rooms.

The lobby’s beam and post construction is reminiscent of traditional barns, creating a seamless transition from buildings that reflect the rustic character of the city. The HVAC system, rooftop solar panels and smart building systems are expected to save up to $2 million in energy costs over the next 20 years, while reducing carbon emissions. Other features include a 610-seat performing arts centre, flexible activity spaces and digital infrastructure designed to prepare students for new and evolving technological demands.

With the new school up and running, the old middle and high school buildings were demolished to make way for new turf athletic fields and a 6,700 square meter stadium building. The entire $122.5 million project is targeting LEED Gold certification.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Interior/Tenant Improvement: United Therapeutics, Organ Manufacturing Group
Next Article Best Project, Landscape/Urban Development: Boston City Hall Plaza
Machinery Asia
  • Website

Related Posts

US judge reverses Trump’s stop-work order on fifth offshore wind project

February 3, 2026

DC Utility steps up efforts to address Potomac River sewage spill of up to 300 million gal

February 2, 2026

French-led consortium to build $6 million water desalination and pipeline project in Jordan

February 2, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

US judge reverses Trump’s stop-work order on fifth offshore wind project

DC Utility steps up efforts to address Potomac River sewage spill of up to 300 million gal

French-led consortium to build $6 million water desalination and pipeline project in Jordan

University of Kansas moves forward on $362 million Phase II Gateway District expansion and Jayhawks Stadium

Popular Posts

US judge reverses Trump’s stop-work order on fifth offshore wind project

February 3, 2026

DC Utility steps up efforts to address Potomac River sewage spill of up to 300 million gal

February 2, 2026

French-led consortium to build $6 million water desalination and pipeline project in Jordan

February 2, 2026

University of Kansas moves forward on $362 million Phase II Gateway District expansion and Jayhawks Stadium

February 2, 2026
Heavy Machinery

Car hauler trailer kit basics for real world towing

January 26, 2026

Hydraulic tilting gooseneck trailer for transporting heavy equipment

January 26, 2026

Aluminum car trailer with tilt bed explained for real world vehicle transport

January 26, 2026

What is the best cover for a car trailer?

January 23, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.