Gordon Center for the Creative and Performing Arts
Waterville, Maine
EXCELLENCE IN SECURITY
Sent by: Consigli Construction Co.
Owner: Colby College
Main design: William Rawn Associates, Architects Inc.
General contractor: Consigli Construction Co.
Civil Engineer: HBV
Structural Engineer: LeMessurier
MEP Engineer: Vanderweil Engineers
The largest academic project in Colby College’s history and the new home of its music, film and performance studies, theater and dance departments, this $95 million, 74,000-square-foot building features flexible performance areas and versatile
Located in a high-traffic area of campus, the contractor prioritized campus safety and developed a project-specific safety plan to protect the university community from the impact of construction, the project team says.

Photo courtesy of Consigli Construction Co.
Directional signage and constant communication with university facilities managers helped the construction team maintain a safe student and faculty experience throughout the project.

Photo courtesy of Consigli Construction Co.
At its peak, 163 workers were on site to meet the project’s 27-month schedule. There were no recordable incidents or lost-time accidents during the 412,000 hours worked, the filing says. Team communication included daily meetings to ensure all subcontractors understood the activity expected on site that day.

Photo courtesy of Consigli Construction Co.
Sitting on rock, the project site required the team to install foundations and utilities. The coordination of security professionals from the contractor, the project team and the university ensured a safe work environment.

Photo courtesy of Consigli Construction Co.
Aerial construction in the show hall also posed a particularly notable challenge due to the 40-foot ceiling height. The structure required a “dance floor” of scaffolding to eliminate aerial lifting work within the space, the filing says. The scaffolding was in place for almost five months.